9
National Crane
Published 8-01-2017 Control # 287-11
9-19
NBT40 SERVICE MANUAL
CRANE INSTALLATION
•
Remove the dust covers from the pump inlet and outlet
ports. Verify that the suction and pressure sides of the
pump are correct while rotating the pump in the same
direction as the PTO. Rotate the pump in the mounting
bracket so suction side is toward the reservoir suction
port. Refer to the pump manual for information on how to
rotate pump ports and how to convert pump rotation.
•
If using a drive shaft type of mount, connect the PTO
drive shaft to the pump and PTO. Drill a 0.31" dia. x
0.12" (7.87 mm x 3 mm) deep hole on the flat of the hex
shaft at the fixed yoke end of the drive shaft to engage
the yoke set screw. A small flat area should be ground in
the O.D. of the splined pump shaft to engage the pump
yoke set screw. Apply Loctite and tighten the shaft
setscrews and grease the PTO universal joints.
REINFORCING AFTER FRAME EXTENSION
1.
Measure the truck frame and use the Section Modulus
Tables to determine the section modulus of the frame. If
reinforcing is required, use at least 100,000 psi steel to
minimize the amount of reinforcing required. Use Grade
90 weld material for any welding to be done.
2.
Strip the frame of obstructions in the area to be
reinforced or extended, one side at a time. If the truck
frame crossmembers are bolted in, remove the bolts.
Do
not remove rivets.
3.
If rivets are used to secure truck frame cross members.
Place the reinforcing (1, Figure 9-11) on the truck frame
(4) and clamp in place.
Mark the location of rivets (3) by striking the outside of
the reinforcing (4) over the rivet area with a hammer so
that the rivets make an impression on the inside of the
reinforcing.
Mark the approximate location of the crane mounting
anchors (5) on the reinforcing (1) so that no obstructions
exist.
Remove the reinforcing (1) and cut clearance holes for
the rivets (3) (Figure 9-11).
4.
If reinforcing (1, Figure 9-11) is to be welded to the truck
frame (4), remove the crossmember bolts (6).
Place the reinforcing (1) on the truck frame (4). Mark the
existing truck frame hole pattern onto the reinforcing (1)
and then remove the reinforcing (1).
U s in g t h e m a r k i n gs , c u t t he ho l e pat te r n i n t he
reinforcing (1). Be sure to clear the crane mounting
anchors (5).
5.
Clamp the reinforcing (1) in place on the truck frame (4),
install crossmember bolts (6) that were previously
removed, and weld to truck frame as shown in
Figure 9-12.
6.
If bolt-on reinforcing is required, clamp the reinforcing (1,
Figure 9-11) in place and install crossmember bolts (6)
that were previously removed.
Drill through the reinforcing and truck frame. Be sure to
clear crane mounting anchors (5) and bolt reinforcing (1)
in place.
See Figure 9-13 for recommended drilling and bolting
locating dimensions. Use 5/8", Grade 8 bolts, drill holes
to 39/64" (15.5mm) diameter, drive fit bolts and torque
according to Torque Chart in Section One. Note that all
dimensions are in inches (millimeter).
7
1
2
3, 6
3, 6
5
4
FIGURE 9-11
Reference Only
Summary of Contents for National Crane NBT40 Series
Page 1: ...Service Manual National Crane NBT40 Series R e f e r e n c e O n l y ...
Page 2: ...R e f e r e n c e O n l y ...
Page 216: ...SCHEMATICS NBT40 SERVICE MANUAL 10 2 THIS PAGE BLANK R e f e r e n c e O n l y ...
Page 218: ...NBT40 SERVICE MANUAL APL 2 THIS PAGE BLANK R e f e r e n c e O n l y ...
Page 219: ...R e f e r e n c e O n l y ...
Page 220: ...R e f e r e n c e O n l y ...