
56
WARNING!
PREVENTIVE MAINTENANCE PROCEDURE
CHALLENGER Series II
Bulletin No.
IX5
Maintenance Point
Frequency Interval
Procedure Information
The air line lubricator automatically dispenses 10 wt. non-detergent oil into the compressed air used to operate the
system. This oil is carried via the air lines to all air cylinders, valves and seals for the purpose of lubrication. The sys-
tem will operate at peak performance when the oil rate is set to one drop dispensed for every 2 complete press cycles
with all print stations and indexer operational.
As Required
Tools required:
1 - Standard blade screw driver (small)
1. Turn “ON” all print stations. Start the press and allow the
press to run with all print stations and index system opera-
tional for 5-10 minutes. After the press has run for 5-10 min-
utes, observe the oil flow rate at the sight dome on top of the
air line lubricator assembly. A proper rate of flow will be 1
drop of oil for every 2 complete press cycles.
2. Should the oil flow rate require adjustment, use the small
standard blade screw driver and adjust the small red colored
metering screw on top of the sight dome for the proper rate
of 1 drop for every 2 complete press cycles. Turn the meter-
ing screw clockwise to decrease the oil flow rate. Turn the
metering screw counterclockwise to increase the oil flow
rate. (See top view illustration at right)
WARNING!
THE INDEX SYSTEM
WILL BE OPERATIONAL DURING
THIS ADJUSTMENT. DO NOT PER-
FORM THIS ADJUSTMENT BY
YOURSELF! ALWAYS WORK WITH
AN ASSISTANT WHO CAN SHUT
THE EQUIPMENT DOWN IN THE
EVENT OF AN EMERGENCY SITUA-
TION. ADJUST THE DWELL TIME
CONTROL IN THE E 300 OPERATOR
INTERFACE SO THAT YOU HAVE
PLENTY OF TIME TO MAKE
ADJUSTMENTS TO THE METERING
SCREW BEFORE THE INDEX TABLE
BEGINS ANOTHER CYCLE.
Sight dome
Metering screw
The frequency of the following preventive maintenance procedure is
based on a 8 hour daily production shift or 40 hour work week.
Summary of Contents for Challenger II 12 COLOR
Page 4: ......
Page 6: ......
Page 8: ......
Page 88: ...Idec Relay Identification NOTES 80 Challenger II mrprint com...
Page 121: ...Challenger b...
Page 122: ......
Page 127: ...NEW BALL SCREW INDEX DRIVE ASSEMBLY Revised 12 27 00...
Page 128: ......
Page 129: ......
Page 130: ......
Page 131: ......
Page 132: ...Challenger b...
Page 133: ......
Page 138: ......
Page 139: ......
Page 140: ......
Page 141: ......
Page 142: ......
Page 143: ......
Page 144: ......
Page 145: ......
Page 146: ......
Page 147: ......
Page 148: ......
Page 149: ......
Page 150: ......
Page 151: ......
Page 152: ......
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ......
Page 157: ......
Page 158: ......
Page 159: ......
Page 160: ......
Page 161: ......
Page 162: ......
Page 163: ......
Page 164: ......
Page 165: ......
Page 166: ......
Page 167: ......
Page 168: ......
Page 169: ......
Page 175: ......