Connection Diagrams

Actuating mechanism BELIMO BLE 24(-ST)

8.

 

Blade overlaps

The overlaps of SEDM 

The overlaps of SEDM 

with flange

AxB

a

c

e

f

Ax180

 - 

 - 

 - 

 - 

Ax200

 - 

 - 

 - 

 - 

Ax225

 - 

 - 

 - 

 - 

Ax250

 - 

 - 

 - 

Ax280

 - 

 - 

 - 

Ax300

-

-

-

Ax315

 - 

 - 

 - 

Ax355

 - 

6,5

 - 

 - 

Ax400

 - 

29

 - 

 - 

Ax450

 - 

54

 - 

4

Ax500

-

79

-

29

Ax550

104

54

Ax560

-

109

-

59

Ax600

-

129

-

79

Ax630

-

144

-

94

Ax650

-

154

-

104

Ax700

11

179

-

129

Ax710

16

184

-

134

Ax750

36

204

-

154

Ax800

61

229

11

179

Ax900

111

279

61

229

Ax1000

161

329

111

279

NOTICE

The  blade  of  dampers  without  flange  exceeds  body  of  fire  damper  by  the  values  “a”  and  “c”.        
The blade of dampers with flange exceeds body of fire damper by the values “e” and “f”. There has 
to be enough space in dust or installation shaft for blade rotation. 

Summary of Contents for SEDM

Page 1: ...027 12 VALID FROM 01 10 2013 INSTALLATION INSTRUCTIONS MULTI COMPARTMENT SMOKE EXTRACTION DAMPER SEDM...

Page 2: ...neral information 3 Assembly information 3 Installation opening 4 Statement of installation 4 The Blades Overlaps 8 The Flanges 9 Connection Diagrams 9 Service assembly and revisions 11 Dimensions 11...

Page 3: ...al duct system EI 120 ved i o S1000C10000HOT 400 30MAmulti EI 120 ved i o S1000C10000HOT 400 30AAmulti Assembly information 1 During installation the damper blade must be in position CLOSED The damper...

Page 4: ...ceiling construction of fire compartment Installation in the solid wall construction of fire compartment Damper blade is in horizontal position Installation in the solid wall construction of fire com...

Page 5: ...NOTICE The actuating mechanism cover must be removable after installation Installation in the gypsum wall construction of fire compartment Position 1 Damper SEDM 2 Gypsum construction 3 Mineral stone...

Page 6: ...amic paper 4 Hinges 2 4 1 3 Installation on the solid wall construction of fire compartment Damper blade is in horizontal position Installation on the solid wall construction of fire compartment Dampe...

Page 7: ...on 4 5 1 2 3 Pozice 1 Damper SEDM 2 Solid ceiling construction 3 Ceramic paper 4 Hinges 5 Cement lime plate Installation on the solid ceiling construction of fire compartment mounting from top 1 4 2 3...

Page 8: ...air conditioning piping must be hung or supported so as all load transfer from the back to back piping to the damper is absolutely excluded Installation in smoke exhaust ducts Installation in vertical...

Page 9: ...0 104 54 Ax560 109 59 Ax600 129 79 Ax630 144 94 Ax650 154 104 Ax700 11 179 129 Ax710 16 184 134 Ax750 36 204 154 Ax800 61 229 11 179 Ax900 111 279 61 229 Ax1000 161 329 111 279 NOTICE The blade of dam...

Page 10: ...10 Actuating mechanism BELIMO BE 230 12 Actuating mechanism BELIMO BE 24 12 ST Actuating mechanism BELIMO BLE 230...

Page 11: ...bserved during fire damper assembly 3 Before entering the dampers into operation after assembly and after sequential revisions checks and functionality tests of all designs including operation of the...

Page 12: ...DM with flanges NOTICE Dimensions for damper with actuating mechanism InMax 50 75 MAND K a s Dob sk 550 26724 Hostomice Czech Republic Tel 420 311 706 706 Fax 420 311 584 810 311 584 382 e mail mandik...

Reviews: