6
Installation on the solid wall (ceiling wall) construction
Position
1
Damper SEDM
2
Solid wall construction
3
Ceramic paper
4
Hinges
2
4
1
3
Installation on the solid wall construction of fire compartment Damper blade is in horizontal position.
Installation on the solid wall construction of fire compartment. Damper blade is in vertical position.
2
4
1
3
Position
1
Damper SEDM
2
Solid wall construction
3
Ceramic paper
4
Hinges