MANDÍK CPV Installation, commissioning, and maintenance
IZU 02/2021
MANDÍK, a.s., www.mandik.cz
R
27
training protocol for the control system, handover protocol for the unit, and unit control
protocol).
9
OPEATION AND MAINTENANCE
9.1
DESCRIPTION OF THE UNIT
–
COMPONENTS
Fig 11 Components, right-hand unit design
ACCESS TO THE PANEL
MAIN SWITCH
FILTER - RETURN
MIXING DAMPER
HEAT RECOVERY BY-PASS
FAN - SUPPLY
BY-PASS DAMPER
SHUT-OFF DAMPER - EHA
FILTER - SUPPLY
MAINS CONNECTION
SHUT-OFF DAMPER - ODA
FAN - RETURN
HEAT EXCHANGER 1
(HEATING / COOLING)
HEAT EXCHANGER 2
(HEATING)