Required For This Page:
15/16” Wrenches
a. Slide a 5/8” Flat Washer (PB) over each of the J-Bolts (AA) in the J-Bolt Template (AM).
b. Position the Pole so the slots in the Pole plate are lined up with the two J-Bolts closest to the playing surface.
c. Push the Pole plate against the Bolts, making sure the slots are lined up exactly with the Bolts.
Using at least six adults,
slowly
and carefully lift the Pole up so the Bolts slide through the slots. Line up the holes at the back of the Pole plate with the Bolts at
the back of the J-Bolt Template and stand the system completely vertical.
Note: Avoid scraping the holes in the plate over the Bolts, as this can damage the threads.
STEP 19
STEP 20
a. Slide a 5/8” Flat Washer (PB) and 5/8” Nylock Nut (PA) over each J-Bolt
(AA). Tighten the Nuts only a few turns onto the J-Bolts.
Do not tighten
the Nuts all the way down to the plate at this time.
AA
PB
PA
The assembled system is very heavy. At
least
six adults are required to complete this step. Keep hands and fingers clear of pinch points.
Do not put hands or fingers between the Pole and the mounting plate at any time. Stand the Pole up slowly and carefully. Failure to
follow all of these instructions and warnings could lead to property damage or serious personal injuries as listed on Page One.
WARNING
**A minimum of six adults are required for this step.**
PB
PA
(4)
(8)
1029755
PB
AA
AM
PB
PB
PB