AP
HE
AO
EA
AN
ZA
HG
ZA
(2)
a. Lift one of the Outside Gas Springs (AD) out of the
way.
b. Slide the Trigger Pin (MB) into the upper holes at the
bottom of the Middle Gas Spring (MM)
c. Place a Valve Pin Wear Sleeve (HA) between the upper
hole of the Middle Gas Spring (MM) and the upper hole
of the right Outside Gas Spring (AD). Slide the Trigger
Pin (MB) through the a Middle Gas Spring (MM), Valve
Pin Wear Sleeve (HA) and the right Outside Gas Spring
(AD).
d. Lower the left Outside Gas Spring (AD). Place a Valve
Pin Wear Sleeve (HA) over the Trigger Pin (MB) and slide
the Trigger Pin (MB) through the upper hole of the left
Outside Gas Spring (AD).
STEP 4
AD
MM
MB
Required For This Page:
MB
1028352
(1)
STEP 5
HG
EA
EC
15/16” Wrenches
EH0028
HE
(1)
(2)
(1)
(2)
13.31”
(Not
actual
length)
AN
(1)
AD
EC EA
AO
ZA
HG
Note: At least one person should support the top of the
Pole while the Handle is installed.
a. Line up the holes in the ends of the Rear Lifter Arms (AO)
with the middle pair of holes in the Handle (AP). Lift the
Gas Springs up until the lower holes in the brackets line up
with the holes in the Handle and Arms.
b. Apply a small amount of the Dark Lithium Grease to a
5/8” x 11 5/8” Hex Bolt (HE).
c. Slide the greased Bolt (HE) through a 5/8” O-Ring (ZA), a
5/8” Flat Washer (EA), a Rear Lifter Arm, a 5/8” x 5/16”
Spacer (HG), the Handle. Insert the Lock Bracket (AN) into
the bottom of the third Gas Spring as shown and slide the
Bolt through the Gas Springs and the Lock Bracket.
d. Slide the Bolt through the other side of the Handle, another 5/8”
x 5/16” Spacer (HG), the other Rear Lifter Arm, a 5/8” Flat
Washer (EA) and a 5/8” O-Ring (ZA).
e. Secure the Bolt with a 5/8” Nylock Jam Nut (EC).
Tighten
the Nut only until it is flush with the end of the Bolt to
allow free rotation.
HA
(2)
HA
(Not actual length)
Mallet
You may need to use a Hammer or
Mallet to tap the bolt into place.