background image

|

 35

 
C E R T I F I C A T E S

CERTIFICATE

CERTIFICATE

DIN EN ISO 14001:2015

Management system as per

Evidence of conformity with the above standard(s) has been furnished  

and is certified in accordance with TÜV PROFICERT procedures for

Certificate registration No.  

73 104 1297

Audit report No.   4352 8721   

First certification 2013-10-01

Certificate valid from 2019-10-01 to 

2022-09-30

scope:

PAGE 1 OF 1. 

This certification was conducted in accordance with the  TÜV PROFiCERT auditing and certification procedures and is subject to

regular surveillance audits. Verifiable under www.tuev-club.de. Original certificates contain a glued on hologram.

TÜV Technische Überwachung Hessen GmbH, Robert-Bosch-Straße 16, D-64293 Darmstadt, Tel. +49 6151/600331   Rev-GB-1711 

Darmstadt,  2019-09-26 

Certification body of  TÜV Hessen 

– Head of Certification body –

D-ZM-14137-01-00

Development, manufacturing and distribution of 

clinic- and health care bed systems, room furnishing

Betten Malsch GmbH

Rohbergstraße 9

36208 Wildeck - Obersuhl

Germany

CERTIFICATE

CERTIFICATE

DIN EN ISO 9001:2015

Management system as per

Evidence of conformity with the above standard(s) has been furnished  

and is certified in accordance with TÜV PROFICERT procedures for

Certificate registration No.  

73 100 1297

Audit report No.   4352 8721   

First certification 2004-07-21

Certificate valid from 2019-10-01 to 

2022-09-30

scope:

PAGE 1 OF 1. 

This certification was conducted in accordance with the  TÜV PROFiCERT auditing and certification procedures and is subject to

regular surveillance audits. Verifiable under www.tuev-club.de. Original certificates contain a glued on hologram.

TÜV Technische Überwachung Hessen GmbH, Robert-Bosch-Straße 16, D-64293 Darmstadt, Tel. +49 6151/600331   Rev-GB-1711 

Darmstadt,  2019-09-26 

Certification body of  TÜV Hessen 

– Head of Certification body –

D-ZM-14137-01-00

Development, manufacturing and distribution of 

clinic- and health care bed systems, room furnishing

Betten Malsch GmbH

Rohbergstraße 9

36208 Wildeck - Obersuhl

Germany

CERTIFICATE

CERTIFICATE

ISO 13485:2016 

EN ISO 13485:2016+AC:2016

 

Management system as per

Evidence of conformity with the above standard(s) has been furnished  

and is certified in accordance with TÜV PROFiCERT procedures for

Certificate registration No.  73 105 1297
Audit report No.   4310 8904   

First certification 2017-07-11

Certificate valid from 2019-04-01 to 2020-07-10

scope:

PAGE 1 OF 1. 

This certification was conducted in accordance with the  TÜV PROFiCERT auditing and certification procedures and is subject to

regular surveillance audits. Verifiable under www.proficert.com. Original certificates contain a glued on hologram.

TÜV Technische Überwachung Hessen GmbH, Robert-Bosch-Straße 16, D-64293 Darmstadt, Tel. +49 6151/600331   Rev-GB-1904 

Darmstadt, 2019-04-01 

Certification body of  TÜV Hessen 

– Head of Certification body –

D-ZM-14137-01-01

Development, manufacturing and distribution of 

clinic- and health care bed systems, room furnishing

Betten Malsch GmbH

Rohbergstraße 9

36208 Wildeck - Obersuhl / Germany

Summary of Contents for Impulse Series

Page 1: ...IMPULSE SERIES INSTRUCTIONS FOR USE CARE DESIGN...

Page 2: ...2...

Page 3: ...ile maintaining the highest standards of safety We would like to thank you for the trust you have placed in us Our company guarantees carefully selected materials and continuous quality control while...

Page 4: ...ull length side rail 16 Split side rail 17 Description of function 18 Back rest 18 Release mechanism of the Back rest CPR optional 18 Upper leg section 18 Height adjustment 19 Transfer position 19 Low...

Page 5: ...bed extension 28 Hand controller holder 29 Horizontal hand controller 29 Side rail height extension triple side rail 29 Troubleshooting 30 Product safety 31 Cleaning and disinfection 32 Disinfection...

Page 6: ...6 Impulse Ambiente Impulse XL Impulse 400 Impulse 400 LR 100 T H E P R O D U C T S...

Page 7: ...ning and relief of disabilities for people in nursing homes and care facilities If the care beds are to be used for other applications prior written agreement from Betten Malsch GmbH is required The p...

Page 8: ...struction manual is designed for the Impulse care bed range The images graphics and text it contains may differ from the equipment supplied The manufacturer offers technician training for maintenance...

Page 9: ...over 50 kg horizontally 10 When operating the CPR optionally available emergency mechanical lowering of the back rest the back rest must also always be released by hand to prevent sudden low ering 11...

Page 10: ...mattress used must meet the applicable safety standards Any continual liquid in the motorised area must be avoided e g incontinence For safety reasons the handle on the trapeze bar should be replaced...

Page 11: ...cal specialist or someone with electrical training using a special measurement and inspec tion device Inspections in accordance with BGV A2 can be carried out by specialist staff trained by the manufa...

Page 12: ...00 206 x 100 cm Impulse Ambiente 206 x 100 cm Impulse XL 206 x 110 cm Reclining surface RS 200 x 90 cm Impulse XL 200 x 100 cm Height adjustment approx Impulse 400 LR 100 25 26 up to 82 cm Impulse Amb...

Page 13: ...e next technical check after delivery in ac cordance with VDE0751 1 Example illustration of a rating plate on an Impulse 400 care bed standard design with mains connection 7 Explanation of the terms u...

Page 14: ...own S3 Foot section adjustment up S5 Auto contour up S7 Lift adjust ment up S9 Anti Trendeleburg2 S4 Foot section adjustment down S6 Auto contour down S8 Lift adjust ment down Transfer pos 1 S10 Trend...

Page 15: ...ck of the hand controller for restricting operation by occupants R1 LOCKED No functions operational R2 UNLOCKED All functions available R3 OCCUPANT SETTING All functions available except S10 S12 R4 UN...

Page 16: ...eg section Seat section fixed CPR emergency lowering optional Latch for side rail Erectable side rails full length Bed panel Foot pedal with central brake 6 and fixed direction 5 of the double castors...

Page 17: ...rail extension CPR emergency lowering optional Adjustable split side rails GS V31 Bed panel Foot pedal with axial fixing 6 5 of the clad 50 mm castors 1 in connection with integrated bed extension Mo...

Page 18: ...t Extended leg elevation D E S C R I P T I O N O F F U N C T I O N Depending on the design and type of care bed the bed can be put into the following positions by adjusting the back rest the upper leg...

Page 19: ...ad just the bed into the low position Low position operating button When the button is activated the bed moves down out of the transfer position and into the low position Caution Before activating the...

Page 20: ...troller Trendelenburg anti Trendelenburg operating buttons Caution Please consider the safety of the oc cupant when adjusting the bed inclination No foreign objects should be located in the area of th...

Page 21: ...uld then be deactivated by moving the reclining surface into a higher position Impulse XL The Impulse XL model movable at any height has a central castor lock ing mechanism which is mechanical ly oper...

Page 22: ...chanically by means of a central foot pedal The foot pedal is located in the middle of the foot area of the moveable frame The Impulse 400 LR 100 model has three possible settings 1 Central locking of...

Page 23: ...Gently lift up the upper side rail B and hold down the locking button A Slowly lower the side rail into the lowest position Caution When lowering and raising the side rails please be extremely carefu...

Page 24: ...lace by two push buttons on the inside of the upper section Use two hands at the same time to carry out telescopic adjustment up or down and to avoid jamming Fig 2 Do not use force 4 To lower the tele...

Page 25: ...for telescopic movement us ing the two spring catches below the hand rail and adjust it to the maximum height Pull the rail up wards using both hands simultaneously Fig B 1 2 Take care not to tilt an...

Page 26: ...mmissioning If necessary e g for maintenance simple assembly proce dures can also be performed by professional authorised per sons We offer comprehensive service instructions for expert authorised sta...

Page 27: ...eclining surface frame either to the left or right of the head foot end The intravenous drip holder is only designed for hanging IV drips not for attaching other accessories or similar items The maxim...

Page 28: ...he end of the bed and carefully pull out the bed extension approx 10 20 cm 3 Turn the locking bolts back to their original position Carefully push the bed extension back until the mecha nism locks int...

Page 29: ...id to standing up or as a handle Caution The additional hand controller must be connected by authorised specialist staff only Side rail height extension triple side rail To guard against pressure sore...

Page 30: ...ving parts and remove any obstructions The safe working load has been exceeded Reduce the load Motors cut out after a longer pe riod of operation The adjustment time or safe working load has been exce...

Page 31: ...management system DIN EN ISO 14971 Risk analysis DIN EN 12182 Assistive products for persons with disability DIN EN 60601 2 52 Medical electrical equipment DIN EN 60601 1 Medical electrical equipment...

Page 32: ...instructions for cleaning and disinfecting our care beds Care of wooden parts Malsch care beds only use wooden parts that are finished in compliance with the DIN 68861 1A standard The aim is to produ...

Page 33: ...reliability of the product if it is maintained regularly and used in accord ance with the safety instructions If any significant faults are found during maintenance work which mean the safe opera tio...

Page 34: ...event of faults caused by materials or manufacture within the warranty period you will receive a replacement or have the fault repaired free of charge This excludes faults and errors caused by inappr...

Page 35: ...was conducted in accordance with the T V PROFiCERT auditing and certification procedures and is subject to regular surveillance audits Verifiable under www tuev club de Original certificates contain...

Page 36: ...Edition 01 2020 Rev 1 8 Colours may vary Technical modifications reserved Betten Malsch GmbH Rohbergstra e 9 36208 Wildeck Obersuhl GERMANY Phone 49 0 6626 915 100 Fax 49 0 6626 915 116 bettenmalsch...

Reviews: