|
51
DELIVERY AND ASSEMBLY
Betten Malsch GmbH hospital beds are generally delivered fully
assembled, or are assembled on site by company technicians or
authorised staff.
Check the delivered bed against documentation for completeness
and conformity.
Any defects or damage must be pointed out to the freight com-
pany immediately and noted on the delivery document.
Signing of the delivery documents by both parties is obligatory
before commissioning.
If necessary, e.g. for maintenance, simple assembly procedures can
also be performed by professional authorised persons.
After maintenance and servicing work has been
completed, check the functionality of electrical sys-
tems.
Assembly of head / foot board / sleeping surface
§
The head / foot boards can be removed without the use
of tools, as they have plug connections.
§
Exchange the side rails and sleeping surface cladding
with the aid of suitable assembly aids and carry out a
function test!
Replacement of the drive system
§
Disconnect the power supply and pull out the plugs.
§
Once the motor has been replaced, plug in the individu-
al systems again.
The manufacturer offers technician training for main-
tenance and servicing work on their hospital beds. A
certificate obtained as part of this training authorises
the holder to carry out technical work independently
on the beds.
Summary of Contents for IMPULSE KL
Page 1: ...CLINIC DESIGN IMPULSE KL INSTRUCTION MANUAL HOSPITAL BED...
Page 2: ...2...
Page 13: ...13...
Page 31: ...31...
Page 33: ...33 GS side rail dimensions When using the ABS metal lattice sleeping surface 378 114 85...
Page 36: ...36 VGS side rail dimensions When using the ABS metal lattice sleeping surface 368 115 85...
Page 41: ...41...
Page 62: ...62 Notes...
Page 63: ...63 Notes...