P 23/ 24
W
iring diagram
Fig. D-2
Switch unit for Contact arm
Ribs J
Rib G
Ribs A
Ribs B
Inner wall
Rib D
Terminal
Boss
Boss
Crank angle sensor
LED circuit
Switch unit for trigger
Rib I
Connector
Rib F
Rib E
Rib C
Rib K
Wiring view under Switch unit for Trigger
Lead wires of Switch unit for
Contact arm must be routed
between Ribs J and Rib K.
Lead wires from two
Switch units must be
routed between Rib H
and Rib G.
Fix Lead wires of
Switch unit (for Trigger)
in these Lead wire
holders.
Ribs H
Switch for operation mode change
Assemble Flag receptacles to Switch
so that the lead wires faces toward
the direction as drawn above.
Lead wire of
LED circuit
must be routed
between Ribs A
and Ribs B.
Lead wires of
LED circuit
must be routed
between Bosses
and Inner wall.
Lead wires of
LED circuit and
Lead wires of
Crank angle sensor
must be routed
between
Bosses and Inner
wall.
These lead wires* must be routed between Rib C and Rib D.
* Lead wires from Switch units
* Yellow Lead wire and Black lead wire from Terminal
* Lead wires from Motor
Do not put Lead wires of
Switch unit (for Contact
arm) on Rib I nor
Connector.
Lead wires from Switch unit
must be routed between Rib E
and Rib F.