background image

 

8

/ 1

0

R

epair

[3] DISASSEMBLY/ASSEMBLY

[3] -3B Spiral bevel gear 6 and Spur gear 42 for DA331D

[3] -4 F/R Change Lever of Switch

ASSEMBLING

Mount F/R change lever to Switch as drawn in 

Fig. 11

.

(1) Assemble Spiral bevel gear 6 to Spur gear 42 as drawn in 

Fig. 9

.

(2) Assemble Gear section to Gear housing as drawn in 

Fig. 10

.

Fig. 11

Fig. 9

Fig. 10

F/R change lever 

Set F/R change lever to Switch with aligning

the cavity portion with the boss of Switch. 

Cavity portion 

Boss

Switch

1R029

Projection

(both side of Lock ring)

While fitting Projection of Lock ring

to the cut portion of Gear housing,

push Gear section into Gear housing 

with 1R029 until it stops.

Cut portion of Gear housing

Cut portion of  Gear housing

Spiral bevel gear 6

Ball bearing 608ZZ

Pin 3.5

Spur gear 42

Lock ring

Ball bearing 696ZZ

Lock ring

Ring spring 6

ASSEMBLING

Summary of Contents for DA330D

Page 1: ...n rpm Charging time approx min Weight according to EPTA Procedure 01 2003 4 kg lbs Capacity Ah Type of cell Voltage V 0 800 Max output W 135 1 1 2 4 Energy capacity Wh Li ion DA330D DA331D 1 1 2 5 2 F...

Page 2: ...setting pipe 23 15 2 Gear extractor large Torque wrench shaft 20 90N m Ratchet head 12 7 for 1R223 1R231 1R269 1R279 1R291 1R398 1 4 Hex shank bit for M8 Bearing extractor Round bar for Arbor 5 50 Re...

Page 3: ...and remove Retaining ring S 12 with 1R291 Then Spiral bevel gear 31 is removed from Drill chuck Note Be careful not to lose Key 4 Repair 3 DISASSEMBLY ASSEMBLY 3 1A Drill Chuck and Spiral bevel gear 3...

Page 4: ...SEMBLING DISASSEMBLING ASSEMBLING Fig 3 1R398 Cloth or something soft Bearing retainer 36 43 Assemble Drill chuck section by reversing the disassembly procedure Refer to the illustrations in Fig 2A No...

Page 5: ...ar housing with a plastic hammer Spindle Bearing box Spiral bevel gear 31 Retaining ring S 12 Key 4 Retaining ring S 12 Ball bearing 608ZZ 3 Bearing box can be removed by hand Remove Ball bearing 608Z...

Page 6: ...ake out Spiral bevel gear 6 and Spur gear 42 as drawn in Fig 5 2 Remove spiral bevel gear 6 as drawn in Fig 6 Fig 5 Fig 6 Key holder Set plate 2pcs Gear housing 1R022 Ball bearing 696ZZ 1 Insert a set...

Page 7: ...drawn below 1 Tap the edge of Gear housing with a plastic hammer to remove Gear section from Gear housing 4 Strike Gear section to work bench to separate Spiral bevel gear 6 from Spur gear 42 2 Remove...

Page 8: ...Fig 11 Fig 9 Fig 10 F R change lever Set F R change lever to Switch with aligning the cavity portion with the boss of Switch Cavity portion Boss Switch 1R029 Projection both side of Lock ring While f...

Page 9: ...erminal side Connector LED Light circuit B B M M M 2 M 1 Red Note Circuit diagram of Switch and DC motor as drawn below is the view from Housing set L side M 1 M 2 M Red mark M Receptacles have to be...

Page 10: ...t circuit Set LED Light circuit to Housing set L while facing Circuit plate to DC motor side Projection of Adhesive Circuit plate DC motor side Boss B Red mark DC Motor Inflect Terminal of DC motor so...

Reviews: