background image

4

/ 1

0

Fig. 2B

Disassemble Drill chuck section as drawn in 

Fig. 2B

.

(1) Preset the fastening torque of 1R223 to 

40 - 45 N·m

(2) Assemble Drill chuck by reversing the disassembly procedure. (Refer to the illustrations in 

Fig. 2B

)

(1) Disassemble Keyless drill chuck as drawn in

 Fig. 2B

.

(2) Disassemble Bearing retainer 36-43 as drawn in 

Fig. 3

.

1. Assemble the repairing tool by attaching 

   1R231, 1R224 and Bit adapter to 1R223. 

2. Grip 1R231 with Drill chuck, then remove Drill chuck

    by turning the repairing tool counterclockwise.

R

epair

[3] -1B. Drill Chuck for DA331D (equipped with Keyless Drill Chuck)

[3] -2. Spiral bevel gear 31 for DA331D

1R223

1R224

1R231

Bit adapter

DISASSEMBLING

DISASSEMBLING

ASSEMBLING

Fig. 3

1R398

Cloth or something soft

Bearing retainer 36-43

Assemble Drill chuck section by reversing the disassembly procedure. (Refer to the illustrations in 

Fig. 2A

)

Note in Assembling 1

:

Close the three Jaws for easy assembling Ball bearing 6806DDW.

Note in Assembling 2

:

Do not forget to mount Key 4 to the groove on Spindle of Drill chuck, and mount Spiral bevel gear 31 to Spindle

while aligning the notch of Spiral bevel gear 31 to Key 4.

ASSEMBLING

[3] DISASSEMBLY/ASSEMBLY

[3] -1A. Drill Chuck and Spiral bevel gear 31 for DA330D (cont.)

1. Set the machine to vise with a cloth or something soft

    to protect the machine, then remove Bearing retainer

    36-43 by turning it clockwise with 1R398.

Note in Disassemble

:

When removing Bearing retainer 36-43,

turn 1R398 with a screwdriver or something like

with pressing 1R398 firmly.

Summary of Contents for DA330D

Page 1: ...n rpm Charging time approx min Weight according to EPTA Procedure 01 2003 4 kg lbs Capacity Ah Type of cell Voltage V 0 800 Max output W 135 1 1 2 4 Energy capacity Wh Li ion DA330D DA331D 1 1 2 5 2 F...

Page 2: ...setting pipe 23 15 2 Gear extractor large Torque wrench shaft 20 90N m Ratchet head 12 7 for 1R223 1R231 1R269 1R279 1R291 1R398 1 4 Hex shank bit for M8 Bearing extractor Round bar for Arbor 5 50 Re...

Page 3: ...and remove Retaining ring S 12 with 1R291 Then Spiral bevel gear 31 is removed from Drill chuck Note Be careful not to lose Key 4 Repair 3 DISASSEMBLY ASSEMBLY 3 1A Drill Chuck and Spiral bevel gear 3...

Page 4: ...SEMBLING DISASSEMBLING ASSEMBLING Fig 3 1R398 Cloth or something soft Bearing retainer 36 43 Assemble Drill chuck section by reversing the disassembly procedure Refer to the illustrations in Fig 2A No...

Page 5: ...ar housing with a plastic hammer Spindle Bearing box Spiral bevel gear 31 Retaining ring S 12 Key 4 Retaining ring S 12 Ball bearing 608ZZ 3 Bearing box can be removed by hand Remove Ball bearing 608Z...

Page 6: ...ake out Spiral bevel gear 6 and Spur gear 42 as drawn in Fig 5 2 Remove spiral bevel gear 6 as drawn in Fig 6 Fig 5 Fig 6 Key holder Set plate 2pcs Gear housing 1R022 Ball bearing 696ZZ 1 Insert a set...

Page 7: ...drawn below 1 Tap the edge of Gear housing with a plastic hammer to remove Gear section from Gear housing 4 Strike Gear section to work bench to separate Spiral bevel gear 6 from Spur gear 42 2 Remove...

Page 8: ...Fig 11 Fig 9 Fig 10 F R change lever Set F R change lever to Switch with aligning the cavity portion with the boss of Switch Cavity portion Boss Switch 1R029 Projection both side of Lock ring While f...

Page 9: ...erminal side Connector LED Light circuit B B M M M 2 M 1 Red Note Circuit diagram of Switch and DC motor as drawn below is the view from Housing set L side M 1 M 2 M Red mark M Receptacles have to be...

Page 10: ...t circuit Set LED Light circuit to Housing set L while facing Circuit plate to DC motor side Projection of Adhesive Circuit plate DC motor side Boss B Red mark DC Motor Inflect Terminal of DC motor so...

Reviews: