background image

3

/ 1

0

Fig. 2A

Drill chuck is factory assembled to Spindle to which Spiral bevel gear 31 is mounted. Consequently, it is impossible 

to replace Drill chuck singly without removing Spiral bevel gear 31 from the Spindle portion of Drill chuck. 

Disassemble Drill chuck section as drawn in 

Fig. 2A

.

Cloth or something soft

1R398

Note in Disassemble

:

When removing Bearing retainer 36-43,

turn 1R398 with a screwdriver or something like

with pressing 1R398 firmly.

1. Set the machine to vise with a cloth or something soft

    to protect the machine, then remove Bearing retainer

    36-43 by turning it clockwise with 1R398.

2. Disassemble Drill chuck section

    by tapping the edge of Gear housing

    with a plastic hammer.

3. Remove Ball bearing 608ZZ with 1R269, and remove 

    Retaining ring S-12 with 1R291.

    Then, Spiral bevel gear 31 is removed from Drill chuck.

    Note

: Be careful not to lose Key 4.

R

epair

[3] DISASSEMBLY/ASSEMBLY

[3] -1A. Drill Chuck and Spiral bevel gear 31 for DA330D

Bearing retainer 36-43

Ball bearing

608ZZ

Retaining

ring S-12

Ball bearing

6806DDW

Pins

3A. If it is difficult to remove Spiral bevel gear 31 

       by hand, remove the gear with 1R045.

       It is possible to remove the gear together with

       Spiral bevel gear 31 using with 1R045. 

       In this case, 

make sure that three Jaws are

       exactly closed before setting 1R045

.

4. Spiral bevel gear 31 and Ball bearing 6806DDW 

    are removed from Drill chuck S-10.

    Note

: Be careful not to lose Key 4.

Key 4

Spiral bevel

gear 31

Spiral bevel gear 31

three Jaws

Note in Disassemble

:

In case three jaws of the drill chuck is not closed 

completely, Pins interfere with Ball bearing 

6806DDW.

Ball bearing

6806DDW

Drill chuck S-10

DISASSEMBLING

Key 4

Spiral bevel gear 31

Summary of Contents for DA330D

Page 1: ...n rpm Charging time approx min Weight according to EPTA Procedure 01 2003 4 kg lbs Capacity Ah Type of cell Voltage V 0 800 Max output W 135 1 1 2 4 Energy capacity Wh Li ion DA330D DA331D 1 1 2 5 2 F...

Page 2: ...setting pipe 23 15 2 Gear extractor large Torque wrench shaft 20 90N m Ratchet head 12 7 for 1R223 1R231 1R269 1R279 1R291 1R398 1 4 Hex shank bit for M8 Bearing extractor Round bar for Arbor 5 50 Re...

Page 3: ...and remove Retaining ring S 12 with 1R291 Then Spiral bevel gear 31 is removed from Drill chuck Note Be careful not to lose Key 4 Repair 3 DISASSEMBLY ASSEMBLY 3 1A Drill Chuck and Spiral bevel gear 3...

Page 4: ...SEMBLING DISASSEMBLING ASSEMBLING Fig 3 1R398 Cloth or something soft Bearing retainer 36 43 Assemble Drill chuck section by reversing the disassembly procedure Refer to the illustrations in Fig 2A No...

Page 5: ...ar housing with a plastic hammer Spindle Bearing box Spiral bevel gear 31 Retaining ring S 12 Key 4 Retaining ring S 12 Ball bearing 608ZZ 3 Bearing box can be removed by hand Remove Ball bearing 608Z...

Page 6: ...ake out Spiral bevel gear 6 and Spur gear 42 as drawn in Fig 5 2 Remove spiral bevel gear 6 as drawn in Fig 6 Fig 5 Fig 6 Key holder Set plate 2pcs Gear housing 1R022 Ball bearing 696ZZ 1 Insert a set...

Page 7: ...drawn below 1 Tap the edge of Gear housing with a plastic hammer to remove Gear section from Gear housing 4 Strike Gear section to work bench to separate Spiral bevel gear 6 from Spur gear 42 2 Remove...

Page 8: ...Fig 11 Fig 9 Fig 10 F R change lever Set F R change lever to Switch with aligning the cavity portion with the boss of Switch Cavity portion Boss Switch 1R029 Projection both side of Lock ring While f...

Page 9: ...erminal side Connector LED Light circuit B B M M M 2 M 1 Red Note Circuit diagram of Switch and DC motor as drawn below is the view from Housing set L side M 1 M 2 M Red mark M Receptacles have to be...

Page 10: ...t circuit Set LED Light circuit to Housing set L while facing Circuit plate to DC motor side Projection of Adhesive Circuit plate DC motor side Boss B Red mark DC Motor Inflect Terminal of DC motor so...

Reviews: