7
M2 ASSEMBLY GUIDE
2. BUILDING THE FRAME
The Frame has 2 main parts: The Top Beam that holds the motors (we recommend attaching
it to a wall) and the Wasteboard on which you will clamp the material you want to the M2 to
cut.
The size of material the M2 can cut is only limited by the chain length. These instructions are
based on the chain included with your M2 and will walk you through how to set up your kit to
cut material as large as 4’x8’.
STEP 1
Measure wall studs for Stud Mounts that will hold the Top Beam
STEP 2
Attach Stud Mounts to Top Beam, at measured distance of wall studs. Then attach Top Beam
to wall, aligning Stud Mounts with Wall studs.
92 "
Step 1: Attach Stud Mounts to wall
65
3 4
" up from floor
(a) Find stud and attach
first Stud Mount using 2pcs
long wood screws in Bag D
(b) Attach Stud Mount
using 2 drywall anchors
and 2pcs long wood
screws in Bag D
Step 2: Mount Top Beam to Stud Mounts on wall
ASSEMBLY GUIDE
Use 8pcs short wood screws in Bag D to attach top beam
Step 3: Attach last two Stud Mounts
146mm [5.75in]
146mm [5.75in]
Stud Mounts directly below
first Stud Mounts
92 "
Step 1: Attach Stud Mounts to wall
65
3 4
" up from floor
(a) Find stud and attach
first Stud Mount using 2pcs
long wood screws in Bag D
(b) Attach Stud Mount
using 2 drywall anchors
and 2pcs long wood
screws in Bag D
Step 2: Mount Top Beam to Stud Mounts on wall
ASSEMBLY GUIDE
Use 8pcs short wood screws in Bag D to attach top beam
Step 3: Attach last two Stud Mounts
146mm [5.75in]
146mm [5.75in]
Stud Mounts directly below
first Stud Mounts
This work is licensed under the creative commons Attribution
NonCommercial-NoDerivatives 4.0 International license.
Last Updated 8.12.2020
Version 1.8