43
Kleiss MCS60-1016 System Manual v.15 June 2020
|
www.MainlineControlSystems.com
Test to make sure there is seal by opening the
blow down valve on the dome and relieving the
pressure in the dome.
Remove handle.
After the plug seal has been verified, unbolt the
drilling dome and remove the dome up and over
the completion tool.
Unbolt the slide gate valve and remove the valve
up and over the completion tool.