11. MACHINE SIZE
Page
11
Ref.
A
B
C
Mod.4632
950
970
1150
12. INSTALLATION
12.1
PLACING THE MACHINE
The machine must be placed on a stable plain surface, capable to support the weight of the machine itself;
any possible difference in height must be in conformity with building rules. When the machine has to be
placed on raised plain surface (higher floor) the load-bearing slab must be adequate to the weight of the ma-
chine.
Put the machine in the right place, as requested operative requirements, where it is easy to connect it to
electrical and pneumatic power supply.
Put the machine in a place where there is enough lighting to see every part of the machine itself.
We suggest also to arrange an exhaust fan nearby the machine to clean it periodically.
12.2
LEVELLING
Adjust the levelling feet so that the machine is perfectly leaned on the floor, then align the working table of
the machine by using a spirit level.
Before going on with levelling, tighten the alignment pins into the threaded holes of the bed frame, remove
the protective oil film from planes and every not painted surface, by using petroleum or kerosene only.
Do not use any solvent as gasoline and diesel oil, because they can damage the paint, making it dull, or oxi-
dize other parts.
Summary of Contents for 16430201
Page 2: ...Page intentionally left blank ...
Page 4: ...Page intentionally left blank ...
Page 7: ...NOTES ...
Page 12: ...Page 8 ...
Page 28: ...Page 24 NOTES ...
Page 32: ...26430002 FRAME GROUP ...
Page 34: ...26405001 TABLE GROUP ...
Page 36: ...26405100 PLANE GROUP ...
Page 38: ...26405104 ANGULAR REFERENCE GROUP ...
Page 40: ...Page 30 26405500 HOLD DOWN CLAMPS UNIT 00001123 BLACK SPIRAL PIPE TR 8x6 ...
Page 42: ...Page 32 26054501 HOLD DOWN CLAMPS UNIT SUBGROUP ...
Page 46: ...Page 36 26401800 LONG FENCE GROUP ...
Page 56: ......