Thank you for purchasing our product! 

 

 

 

   

 SO THAT YOU REMAIN SATISFIED WITH OUR PRODUCT, WE RECOMMEND THAT YOU FOLLOW THESE  

FUNDAMENTAL PRINCIPLES FOR 

LONG LIFESPAN AND SUSTAINABLE PROPER OPERATION  

OF THE BOILER  

 

 

1.

 

Use only dry wood fuel with max. 20 percent moisture content – (2 years old wood).  

2.

 

During  the  process  of  gasification  of  solid  wood  some  tar  and  other  condensates  (acids)  may  accumulate  in  the  fuel  bin. 
That  is  why  a  four-way  mixing  valve  or  a  Laddomat  needs  to  be  installed  right  next  to  the  boiler.  We  adjust  the  mixing 
valve in such a way that the operating temperature of the water inside the boiler is between 75 and 90 ºC (167  – 194 ºF).  
The prescribed minimum return water temperature is 60 ºC (140 ºF). 

3.

 

When a circulating pump is used, the heating medium’s temperature gradient must be ensured of at least 15 – 20 °C and a 
minimum return water temperature of 60 ºC (140 ºF). The pump must be connected to the thermo switch in such a way that 
it only operates when the required minimum temperature is reached. 

4.

 

The boiler must not be continually operated at an output capacity less than 60 % of its rated capacity.  

5.

 

For correct and safe operation of the boiler the following principles must always be observed: 

-

 

Boiler cleaning on a regular basis during a heating season;  

-

 

Thorough cleaning of the boiler after the end of a heating season;  

-

 

Required chimney  draught (sufficient combustion products velocity) 

-

 

Good thermal insulation of the chimney; 

-

 

Regular inspections of chimney draft (chimney-sweeper). 

 

6.

 

It is recommended to install a boiler in a system with an accumulative tank. 
 

 
WARNING – If the above instructions are not followed the life of the boiler’s body and the ceramic fireproof insulation 
bricks  may  be  substantially  reduced  as  a  result  of  low  temperature  corrosion.  The  boiler  body  may  become  badly 
corroded as early as within two years.

 

Summary of Contents for MA 15

Page 1: ...MA 31 MA 40 MA 49 MA 80 With an exhaust fan and CONTROL UNIT ERS AK 6000 BOILER OPERATION AND MAINTENANCE MANUAL MAGA s r o S Koll ra 86 979 01 eren any Rimavsk Sobota Slovakia Tel fax 421 47 56 34 79...

Page 2: ...and a minimum return water temperature of 60 C 140 F The pump must be connected to the thermo switch in such a way that it only operates when the required minimum temperature is reached 4 The boiler m...

Page 3: ...25 0 25 Boiler Weight kg 310 350 380 Exhaust Socket Diameter mm 159 159 159 Boiler Height mm 1120 1120 1210 Boiler Depth mm 1000 1140 1140 Boiler Width mm 570 570 570 Water capacity l 65 70 75 Boiler...

Page 4: ...red boiler must be operated in accordance with the instructions contained in this operating and maintenance manual The boiler must be operated by adults only CAUTION When you fire up a new boiler for...

Page 5: ...y For the boilers MA approximate dimensions of the boiler s cross section are 20 x 20 cm Minimum height 7 m 20 cm Minimum height 8m Exact dimensions of a chimney for this purpose in Slovakia are gover...

Page 6: ...al s such floor must be shielded with a thermally insulating fireproof board extending at least 300 mm beyond the ground plan on the firetending side and at least 100 mm beyond the ground plan on all...

Page 7: ...nce to a boiler that is currently under operation When operating a solid fuel fired boiler no inflammable liquids are permitted to be used for firing up Increasing in any manner a boiler s output capa...

Page 8: ...et 9 Primary air inlet 10 Ceramics nozzle 11 Firing flap valve 12 Primary air inlet duct 13 Clean out cover 14 Smoke flue outlet 15 Firing valve s draw rod 16 Fuse 17 Chimney sensor flue gas temperatu...

Page 9: ...lly or through an electronic regulating device that will provide a more comfortable and more economic operation of the boiler Any related electrical wiring and devices must be done installed by author...

Page 10: ...Boiler Installation Connection with a Thermoregulating Valve Boiler Installation Connection with a Heat Storage Tank...

Page 11: ...he storage tank and the outdoor temperature Recommended heat storage unit sizes Boiler Type MA 15 MA 20 MA 25 MA 31 MA 40 MA 49 MA 80 Capacity kW 15 20 25 31 40 49 80 Volume l 1000 1000 1500 1500 2000...

Page 12: ...WATTS STS 20 connected to water supply piping In the event you use your own well you can protect your boiler using a backup electric power source to sustain the operation of at least one pump Another...

Page 13: ...before you fill up the boiler with heating water The Danfoss BVTS Honeywell TS 130 or the WATTS STS 20 valve the sensor of which is located in the lateral part of the boiler is intended to protect the...

Page 14: ...18 CONTROL UNIT ERS AK 6000 AK 6000 Maga Wood Gasifying Boilers Control System User Manual...

Page 15: ...outlet Do not operate the boiler unless all enclosure panels are properly in place In case of failure detection or damaging any part is important o do not touch any part of boiler o immediately discon...

Page 16: ...l suply ending after fuel suply is passed by menu level or choice confirmation data storage o long 2 sec pressing entrance to user operation settings button decreasing adjusted value or switching depi...

Page 17: ...peed in suction version or to 0 in blower version Combustion Continuous regulation of the fan keeps the boiler temperature on the acquired value Critical values of temperatures and thermostat automati...

Page 18: ...r and make all required action Short press the ENTER boiler gets in original state again End of the combustion Combustion temperature decreases under the minimal value boiler is automatically turned O...

Page 19: ...two seconds long Basic view goes to the frame 1 where we use short click on the ENTER and we are in the frame 1 1 Short click of the ENTER and we can set required temperature by buttons or in 70 85 C...

Page 20: ...ut It keeps the embers waiting 50 130 C Main fan power change For example value 3 decreases fan speed in 30 3 2 2 3 Fan minimal speed This value is limit for speed decrease of the fan after reaching r...

Page 21: ...ouble click of the ESC All the connected accsesories are monitored by system Common error status is displayed by red color of the LED More exactly is error message displayed on the LCD display in the...

Page 22: ...t basic view we must hold the button ENTER two seconds long One click on the button will get us to the frame 6 By means of the ENTER button we can enter into the version display By means of the ENTER...

Page 23: ......

Page 24: ...n date Stamp and signature of the producer Date of sale Stamp and signature of the seller Date of putting into operation Stamp and signature Letter of guarantee is not valid unless properly filled in...

Page 25: ...of product Guarantee does not include any materials that are subject to common wear and tear sealing and packing rope fire concrete block and filling and sibral filling Guarantee will not be granted...

Page 26: ...Record of performed guarantee repairs Record of performed repairs within guarantee period and after Date of the record Performed activity Organization signature stamp Signature of the customer...

Page 27: ...MA 15 MA 20 MA 25 MA 31 MA 40 MA 49 MA 80 Producer MAGA s r o S KOLL RA 86 EREN ANY 979 01 RIMAVSK SOBOTA SLOVAKIA Above mentioned products are compatible with the following standards EN 303 5 2001 S...

Reviews: