995086
–
Rev B
Page 18 of 32
4.
Using a 2.5mm Allen Key, remove the four M3 screws securing the board to the chassis.
5.
The PCB can now be removed from the portable lift.
Refitting / Replacement
Refitting is a reversal of the removal process noting the following points:
•
The power lead should always be connected last.
•
Make sure to connect each component to the correct port.
•
Ensure that the motors are connected to the correct port. The correct motor port is inscribed onto the
PCB.
•
Make sure to secure the PCB to the chassis before reconnecting the power, do not allow the board to
come into contact with the chassis other than its designated mounts.