24
ADDITIONAL FITMENT NOTES
•
Once completed the temporary installation of the FeedStorm Kit, trial the actuators
with caution, using the Remote controller unit from the cabin. Ensure the range
achievable is at the optimum intended.
•
When content with the range abilities and overall positioning of the FeedStorm on
the header front, proceed to completing the welding operation.
DO NOT attempt to harvest produce until the FeedStorm is permanently fixed to the
header front.