![MacDon A30-S Assembly Instructions Manual Download Page 11](http://html2.mh-extra.com/html/macdon/a30-s/a30-s_assembly-instructions-manual_3211935011.webp)
UNLOADING AND ASSEMBLY
Form # 169078
Model Year - 2009
9
STEP 4. INSTALL GAUGE
ROLLERS
If kit not supplied proceed to STEP 5. LOWER
HEADER, otherwise install kit as follows:
NOTE
This kit may be installed later in the
header assembly sequence but it may be
easier prior to laying the header down.
a. Unpack gauge roller bundle.
b. Remove two clevis pins (A) from each assembly.
c. Remove nuts, bolts, and clips (B) from
assembly.
d. Insert tabs on roller assembly into slots (C) on
cutterbar at outboard mounting locations on
frame and secure with two clevis pins (A) at
lowest position.
e. Attach clips (B) with bolts and nuts removed at
step c. to secure roller assembly to cutterbar.
NOTE
Use a socket and ratchet wrench to
access the nuts.
f. Remove clevis pins (A) and adjust rollers to
desired height. Re-install two clevis pins (A) and
secure with lynch pins.
g. Repeat above steps for opposite side. Set both
gauge rollers to same position.
B
A
C
A
A
B