![MacDon A30-S Assembly Instructions Manual Download Page 10](http://html2.mh-extra.com/html/macdon/a30-s/a30-s_assembly-instructions-manual_3211935010.webp)
UNLOADING AND ASSEMBLY
Form # 169078
Model Year - 2009
8
STEP 2. REMOVE UNDERSIDE
SHIPPING STAND
CAUTION
Keep feet clear when removing final bolts.
a. Remove four bolts (A) and remove shipping
stand (B). Discard stand and hardware.
STEP 3. INSTALL ADDITIONAL
SKID SHOES
If kit not supplied, proceed to STEP 4. INSTALL
GAUGE ROLLERS, otherwise proceed as
follows:
NOTE
This kit may be installed later in the
header assembly sequence but it may be
easier prior to laying the header down.
a. Unpack skid shoe bundle.
b. Remove two clevis pins (C) from each skid
shoe.
c. Remove nuts, bolts, and clips (D) from skid
shoe.
d. Insert tabs on skid shoe into slots (E) on
cutterbar at inboard mounting locations on frame
and secure with clevis pin (C).
e. Attach clips (D) with bolts and nuts removed at
step c. to secure skid shoe to cutterbar.
NOTE
Use a socket and ratchet wrench to
access the nuts.
f. Remove clevis pin (C) and adjust skid shoe to
desired height. Re-install two clevis pins (C)
and secure with lynch pins.
g. Repeat above steps for opposite side. Set both
skid shoes to same position.
A
A
B
D
C
D
C
E
C