INSTALLATION
Loosen the fixing screw in front of the unit in order to separate the body from the base socket.
■
FIXING SCREW
The fixing screw can be pushed into the body when it is
not in use. Tighten the knob until the body is securely at-
tached to the base socket. Push it into the body and turn it
clockwise to lock. Push the knob and turn it counterclock-
wise to unlock so that the know pops out.
■
DIN Rail
35mm wide
Spring Loaded
DIN Rail Adaptor
DIN RAIL MOUNTING
Set the base socket so that
its DIN rail adaptor is at
the bottom. Position the
upper hook at the rear side
of base socket on the DIN
rail and push in the lower.
When removing the socket,
push down the DIN rail
adaptor utilizing a minus
screwdriver and pull.
■
WALL MOUNTING
Refer to the drawings in
the shown below.
TERMINAL CONNECTIONS
Connect the unit as in the diagram below or refer to the connection diagram on the side of the unit.
■
EXTERNAL DIMENSIONS unit: mm (inch)
28.5 (1.12)
83 (3.27)
94 (3.70)
8
(.31)
124 (4.88)
22 (.87)
6 (.23)
59 (2.32)
11–M3
SCREW
72 (2.83)
36 (1.42)
29.5 (1.16)
2–4.2x5
(.17x.20)
MTG HOLE
6 (.24) deep
DIN RAIL
35mm wide
[4 (.16)]
• When mounting, no extra space is needed between units.
4
8 7
10
8
(.31)
11
5
6
1
2
3
9
■
CONNECTION DIAGRAM
1
2
4
7
8
+
−
OUTPUT
U
V
POWER
S3
S2
S1
R1
R2
SELF-
SYNCH
10
11
CONFIGURATOR
JACK
*
1
*
2
*
1.
The output increases when the self-synch rotates clockwise. For
changing the operation to counterclockwise and increase, set the
ITEM 10 'Rotating direction' to CCW.
*
2. The power input of the unit has polarity. Be sure that the connection
for R1 and R2 of the self-synch. When the connetion is reversed, the
signal conditioner output will be shifted by 180°.