5
Wall Station Back
Wall Station Front
Phillips Head Screws
Additional wired wall stations may be installed in accordance with these instructions.
Route the wires from wall station location up the garage wall and across the ceiling then down
to front of opener. Tack the wires in place using wire staples (Not Supplied).
Take care to run wires in a location where
they will not interfere with the operation
of the door or present a hazard to persons
in the garage. Take care to position staples
so they do not penetrate the wires and
cause a malfunction.
Open Light Cover by depressing lock buttons
on either side of Light Cover and swinging
cover down. Wiring can be performed without
removing Light Cover but if removal is desired
squeeze legs of hinge arms together and
disengage tabs from front of housing.
Set Light Cover aside in a safe location.
Pass wires from wall station through wire guide
tube on left side of opener front panel and out
through opening at terminal block.
Cut wires to length about 2 inches below terminal
block opening being sure wires are not pulled tight.
Pull wires gently up guide tube and fold into opening above terminal block.
Keep wires to the right so there is space to install light beam wires on opposite side of
terminal block.
Wired Wall Station Installation (Continued)
14
Wire Guide
Tube
CAUTION:
Over tightening screws could damage plastic case.
Strip about ½ inch of insulation from ends of wires using a wire stripper. Be sure wire is not nicked
while stripping insulation. Wall station wires are inserted into right side holes of terminal block.
Using a small screwdriver, depress orange tab above terminal block hole, insert wire fully to
insulation and release tab. Test connection by gently pulling on wire to be sure it is secure.
Install second wire in remaining right side hole and test connection.
Terminal Board
OBS
PB