![Lutron Electronics Sivoia QED Technical Reference Manual Download Page 33](http://html.mh-extra.com/html/lutron-electronics/sivoia-qed/sivoia-qed_technical-reference-manual_1950784033.webp)
prewire
|
roller 100
|
dual-mounted
Determine where to drill for cable access. See options below.
Two lengths of 12-18” of cable should exit the ceiling, jamb or either wall on the EDU side of the shades.
Sivoia QED
TM
(quiet electronic drive) Shading System
3.6
24/7 Service and Support: 1-800-446-1503
WIRING
Drill for cable 5 1/4" - 6” from
back and 4 1/4" -5” from top of
system.
Drill for cable 1 1/2" - 3 1/2” from
back and 1 1/4" - 2” from end of
system.
glass
jamb
ceiling
Drill for one cable 2 1/2" - 3 1/2” from
top and 1 1/2” - 2 1/2” from end of the
system. Drill for second cable 6 1/2” -
7 1/2” from top and 1 1/2” - 2 1/2”
from end of system.
Drill for cables 1 1/2" - 2 1/2” from
top and 1 1/2" - 2 1/2” from end of
system.
wall opposite glass side
wall on glass side
glass
glass
glass