background image

®

Wallbox Power Module Installation and Operation Guide   2

D1 D1 D2 D2

DALI-Compliant Bus Wiring

 

(See the bus wiring details section for 
complete specification)

Note:

 DALI-compliant bus link wires are 

not polarity sensitive. Labels D1 and D2 
are for illustration purposes only.

•  Pull power wiring from distribution 

panel and to light fixtures

•  Each line voltage terminal can accept 

one 4.0 mm

2

 wire

•  Consult Lutron for non-dim relay wiring 

and/or load side emergency transfer 
wiring

D1 D1 D2 D2

1 2 3 4 5 6 L N

1 2 3 4 5 6 L N

Wiring the Wallbox Power Module with DALI Control Unit:
Overview of Line Voltage/Mains and DALI-Compliant Bus Wiring

Distribution 

Panel

Rear of  

WPM control 

unit

120 V

~

 or 

220–240 V

~

 only

Not used

 4.0  mm

2

 each 

terminal

Line Voltage/Mains 

Cables and 

Load Wiring

D2

D1

D2

D1

To additional 

DALI-compliant loads

D1 D1 D2 D2

DALI-compliant 

loads

Terminal labels:

L: Hot/Live
N: Neutral
    : Ground

Summary of Contents for LQR-WPM-16D

Page 1: ...mbers Ratings 120 240 V 50 60 Hz 100 mA 230 V 50 60 Hz 100 mA Typical Power Consumption 7 W 24 BTUs Power Draw Units PDUs 0 Output DALI Link 18 V 250 mA Codes Install in accordance with all applicable...

Page 2: ...age terminal can accept one 4 0 mm2 wire Consult Lutron for non dim relay wiring and or load side emergency transfer wiring D1 D1 D2 D2 1 2 3 4 5 6 L N 1 2 3 4 5 6 L N Wiring the Wallbox Power Module...

Page 3: ...WARNING Shock hazard May result in serious injury or death Always turn off circuit breaker or remove main fuse from power line before doing any work Step 3 Connect line voltage and loads to control u...

Page 4: ...e live Always turn off circuit breaker or remove main fuse from power line before wiring and servicing the Wallbox Power Module Step 1 Use the wire size chart at right to determine which wire size to...

Page 5: ...use from power line before doing any work Step 1 Strip 25 mm of insulation from the IEC PELV NECR Class 2 cable Step 2 Strip 7 mm of insulation from each wire in the cable Step 3 Connect the wires to...

Page 6: ...e on rest the top of the wallplate in the grooves at the top of the unit and press firmly at the bottom corners to secure Step 4 Turn on circuit breaker and check that it does not trip For any feed ci...

Page 7: ...ou to move through the menu choices The current choice is highlighted on the info screen OK Button The OK button chooses the current highlighted menu choice This will either take you to the next menu...

Page 8: ...tton to erase all current programming reset and address DALI devices and find sensors on the system 5 Exit programming mode Note After running Build System Zone 4 will control all DALI devices for dia...

Page 9: ...display at the bottom of the screen and the LEDs for the zone will go on otherwise the info screen will display Unassigned Press the zone raise button to assign the device to that zone Press the zone...

Page 10: ...he OK button to accept 3 Use the Master buttons to highlight Address All and press the OK button to accept All DALI devices in the system will go to full On As each DALI device is addressed the Wallbo...

Page 11: ...the third tap Step 2 Keep the Default Scene Button pressed on the third tap for approximately 3 seconds until the LED flashes slowly Step 3 Release the Default Scene Button and immediately triple tap...

Page 12: ...and shorts HomeWorksR QS only Device is in the Factory Default Settings mode and has not been activated into the system Use the system software to verify activation or reactivate the device and transf...