![background image](http://html1.mh-extra.com/html/lutron-electronics/ecosystem-energi-savr-node/ecosystem-energi-savr-node_installation-manual_1950973002.webp)
EcoSystem
®
Energi Savr Node
TM
Installation Guide
Lutron
®
|
2
EcoSystem
®
Energi Savr Node
TM
|
Installation Guide
QS LINK
ECO1
ECO1
RESET
ECO2
TEST
GROUP 1
+20V
OCC
1
PHO
TO
1
IR
1
CO
M
+24V
MU
X
PWR
TEMP
TEST
MU
X
CO
M
GROUP 2
+20V
OCC
2
PHO
TO
2
IR
2
CO
M
GROUP 3
+20V
OCC
3
PHO
TO
3
IR
3
CO
M
GROUP 4
+20V
OCC
4
PHO
TO
4
IR
4
CO
M
CONTACT CLOSURE
ETHERNET
CC
I
CO
M
EMER
G
CO
M
ECO1
H
N
G
Product overview
An
EcoSystem
Energi Savr Node
system consists of an
EcoSystem
Energi Savr Node
unit,
EcoSystem
-compatible ballasts, inputs,
wallstations, and QS devices. The diagram on the previous page shows an example of control inputs that are part of a system.
•
EcoSystem
Energi Savr Node
units are powered by line voltage (Hot and Neutral).
• The
EcoSystem
Energi Savr Node
unit has inputs for:
– 4 Lutron
®
daylight sensors (model: EC-DIR-WH)
– 4
Lutron
occupant sensors (models:
Lutron
LOS series)
– 4
Lutron
infrared (IR) receivers (models: EC-DIR-WH, EC-IR-WH, CC-1BRL-WH, CC-4BRL-WH)
– 1 contact closure input
– 1 emergency contact closure input (defaults to Emergency Mode in the absence of a contact closure across the input)
• The QS Link can have up to 100 zones, 100 areas, and 100 QS devices.
• The
EcoSystem
Energi Savr Node
unit counts as 1 QS device and 1-100 zones on the QS link (depending on system programming).
• In a system, a maximum of 100 wired or wireless daylight sensors, 100 wired or wireless occupancy sensors, and 100 wired or
wireless controllers (Pico
®
wireless controllers,
EcoSystem
wallstations, IR receivers, or QS wallstations).
• The
EcoSystem
Energi Savr Node
unit supplies up to 30 Power Draw Units (PDUs) for powering accessory QS devices and sensors/
controls wired to QS Sensor Modules (QSMs). Refer to accessory device documentation for power draw information.
Refer to the following step-by-step guide for proper
EcoSystem
Energi Savr Node
unit installation.
Wiring overview
QS
Link
QS LINK
ECO1
ECO1
RESET
ECO2
TEST
GROUP 1
+20V
OCC
1
PHO
TO
1
IR
1
CO
M
+24V
MU
X
PWR
TEMP
TEST
MU
X
CO
M
GROUP 2
+20V
OCC
2
PHO
TO
2
IR
2
CO
M
GROUP 3
+20V
OCC
3
PHO
TO
3
IR
3
CO
M
GROUP 4
+20V
OCC
4
PHO
TO
4
IR
4
CO
M
CONTACT CLOSURE
ETHERNET
CC
I
CO
M
EMER
G
CO
M
ECO1
H
N
G
Control
power
EcoSystem
Digital Links
QS LINK
ECO1
ECO1
RESET
ECO2
TEST
GROUP 1
+20V
OCC
1
PHO
TO
1
IR
1
CO
M
+24V
MU
X
PWR
TEMP
TEST
MU
X
CO
M
GROUP 2
+20V
OCC
2
PHO
TO
2
IR
2
CO
M
GROUP 3
+20V
OCC
3
PHO
TO
3
IR
3
CO
M
GROUP 4
+20V
OCC
4
PHO
TO
4
IR
4
CO
M
CONTACT CLOSURE
ETHERNET
CC
I
CO
M
EMER
G
CO
M
ECO1
H
N
G
Contact
Closure
Inputs
CCI
Emerg Ethernet
Jack
(Programming
Only)
Inputs