
Installation...Water connections
1-13
LTO
1.4.2.2 P
ROCEDURE
Flow chart
To connect the water supply to the edger and fit the pipes, follow the procedure below:
Flow chart 1-3: Pipe connections
#1 Check that the machine is switched off: On/Off switch OFF and mains plug
disconnected.
#2 Check that the water supply is closed.
#3 Ensure that the machine is level => screw or unscrew the four feet.
#4 Connect the water drain pipe to the chassis.
#5 Fit the filter seal between the water supply connection and the valve if you
operate in direct water supply.
#6 Connect the water supply pipe to the valve (if direct water) or to the pump
(in closed circuit).
#7 Connect the used water discharge pipe if you operate in direct water supply.
#8 When the water circuit is being filled, check the watertightness of the unit,
especially around the solenoid valves.
#9 If operating in closed circuit, connect the pump supply to the pump power
connector.
Summary of Contents for Briot emotion2
Page 1: ...Instruction Manual FC 00986 Rev00...
Page 7: ...LTO REVISION FOLLOW UP Revision 00 Page New Modified Item...
Page 8: ...1 INSTALLATION...
Page 19: ...2 PRECAUTIONS FOR USE...
Page 23: ...3 USING YOUR EDGER...
Page 53: ...Using your Edger Usual procedure 3 52 LTO Block support 5 6 Blocker head Blocker arm 7 9 8...
Page 81: ...4 CONFIGURATION...
Page 92: ...5 MAINTENANCE...
Page 131: ...Maintenance Adjustments 5 130 LTO Screen 5 8 Adjustment of the touch screen...
Page 153: ...6 TESTS...
Page 158: ...7 TECHNICAL SPECIFICATIONS...
Page 162: ...2 rue Roger Bonnet 27340 PONT DE LxARCHE FRANCE T l 33 50 232 989 132 Fax 33 50 235 020 294...