2-6
ORINOCO WavePOINT-II - Getting Started
Installing the WavePOINT-II AP - Hardware Installation
Placing Mounting Plate and Power Supply
2
1. Use the screws and plugs provided to fix the mounting plate of the
ORiNOCO WavePOINT-II AP in the chosen position.
Note that the mounting plate is positioned correctly as pictured in Figure
2-2, (the marked arrow pointing upwards).
!
WARNING:
The Mounting Plate of the ORiNOCO WavePOINT-II AP has not
been designed for ceiling mounting. In environments where the unit
will be exposed to vibrations, ceiling mounting might cause the
processor module to slide off the mounting plate, causing severe
personal injury and/or damage to your ORiNOCO equipment.