Lorenz trapeo Installation Manual Download Page 9

9

Montage der Dachhaken

Place the next module in position and fasten both modules using 
the central clamps. 

Mount all the other modules in the same way.  Put an end clamp 
on the end of each module row. 

The M8 screws should be tightened to a torque of 16 Nm.  Please 
avoid any distortion of the module frame and the potential dama-
ge to the module that could result from this. 

Make sure that the gap between the side of the module frame and 
the module clamp is not larger than 1 mm.  Otherwise there is a 
risk that the module could work loose from the clamp when hea-
vily loaded.

Module fixed using clamp 

Installation

Screw torque

16 Nm

Gap between frame and clamp 

End clamp  
RHxxx.Set
13 92 3xx 00*

Components required

Central clamp  RH35-50.Set
13 92 1xx 00*

3.4

 Electrical connection of the modules 

Attention:

 Even with low levels of radiation, the modules will re-

ach their full voltage.  Depending on the number of modules in 
one string, several hundred volts coud be achieved.  This could 
put life at risk.

Connect the solar modules to each other using the connection 
cables provided. Check that the polarity is correct. 

!

 

Make sure that the cable insulation is not damaged by 

any sharp edges. Once the work is complete, please check 
that the open circuit voltage is correct in the string cables.

These instructions provide information on the correct 
way to install the LORENZ

®

-mounting system, including 

the mounting of modules.  They are not a replacement 
for the specialist knowledge required when planning 
and installing photovoltaic systems in accordance with 
all the relevant regulations and directives.

The manufacturer accepts no responsibility for damage 
arising from the incorrect handling of the parts deliver-
ed, from construction using components which do not 
form part of this system, or from incorrect installation.  
Responsibility for securely fixing the mounting system to 
the roof surface and for ensuring that the roof remains 
watertight, lies with the installer. 

Liability

Summary of Contents for trapeo

Page 1: ...Installation manual LORENZ trapeo LORENZ Solar module mounting system...

Page 2: ...all the safety instructions from page 10 before installing LORENZ trapeo for the first time Also please check out any new system components and functions of our mounting system Four pre drilled holes...

Page 3: ...ons 2 1 Test modules 6 2 2 Check inverters 6 2 3 Install safety devices 6 3 Mounting 3 1 Mounting the U shaped rails 7 3 2 Laying the cables 8 3 3 Mounting the modules 8 3 4 Connecting the modules 9 4...

Page 4: ...ect overview right from the start Very easy to use and totally reliable the software leads you through the process from identifying wind and snow load zones and how to enter your specific module layou...

Page 5: ...es to positioning the clamps Planning the distance between rails Option 1 short short standard 1 3Planning the mounting system The U shaped rails are available in 3 different lengths 139511000 U shape...

Page 6: ...The equipotenti al between the mounting system and the trapezoidal sheet roof is ensured in accordance with DIN VDE standards by using thin sheet metal screws Should the building have lightning protec...

Page 7: ...h points Screw the U shaped rail into place using the screws supplied until it is tight enough to create a secure seal recommended torque max 3 Nm Make sure that all U shaped rails are running in the...

Page 8: ...ollow the mounting instructions provided by the module manufacturer in order to ensure that any war ranty rights are protected This is particularly important when it comes to the positioning of fixing...

Page 9: ...ding on the number of modules in one string several hundred volts coud be achieved This could put life at risk Connect the solar modules to each other using the connection cables provided Check that t...

Page 10: ...ailure to do so can lead to injury and other damage Please keep these safety instructions close to hand The need for professional planning Before starting to construct the solar module mounting system...

Page 11: ...ork make sure you have all the necessary safety equipment Ensure too that all those involved in the work have been provided with and are observing the relevant safety instruc tions Please find below a...

Page 12: ...ransport of the original components or LORENZ Mounting System The buyer is here by bound to cover these costs 2 WARRANTY PERIOD The warranty is valid for a period of ten years beginning on the date on...

Page 13: ...ENZ in written form 7 MISCELLANEOUS If one regulation of this warranty declaration should be or become in valid the validity of the remaining regulations of the warranty shall remain unaffected An inv...

Page 14: ...zur bernahme dieser Kosten 2 GARANTIEZEIT Die Garantie ist g ltig f r die Dauer von 10 Jahren beginnend mit dem Datum des Vertragsabschlusses f r den Erstkauf des K ufers zur Montage des Montagesystem...

Page 15: ...r Form bei LORENZ geltend zu machen 7 SONSTIGES Sollte eine Bestimmung dieses Garantieversprechens unwirksam sein oder werden bleibt die Wirksamkeit der brigen Regelungen der Garantie davon unber hrt...

Page 16: ...ysteme GmbH Alfred Nobel Stra e 7 9 50226 Frechen Tel 49 0 221 126107 0 Fax 49 0 221 126107 19 www lorenz montagesystem de E Mail info lorenz ms de For errors or omissions we assume no liability Art N...

Reviews: