Lorenz trapeo Installation Manual Download Page 2

2

Welcome

Welcome to LORENZ

®

Thank you for deciding to use a product from the LORENZ

®

 fami-

ly. LORENZ

®

 trapeo is a simple, flexible mounting system for tra-

pezoidal roofs.

Please read these instructions for mounting the system. They ex-
plain how to mount parallel systems on pitched, trapezoidal sheet 
roofs in accordance with DIN 18807.

Pre-assembled mounting kits ensure rapid installation.  The use of 
self-tapping screws means there are no shavings and no need to 
pre-drill. 

Your personal LORENZ Customer Service contact will be 
happy to help, should you have any questions that are not 
answered by these installation manual.

+49 2234 93309-0

Questions

!

 Please read carefully all the safety instructions (from page 

10) before installing LORENZ® trapeo for the first time.  Also, 
please check out any new system components and functions of 
our mounting system. 

Four pre-drilled holes.  
Suitable for use on all 
trapezoidal geometries 

EPDM seals

40 cm, 74 cm and 94 cm aluminium rails

Cable clip

Clamp from the  
LORENZ® solo 
system

• 

Suitable for use on all trapezoidal sheet 
geometries, on roofs with a pitch of up to 
60°

• 

Can be used with any framed modules 

• 

Your roof is guaranteed watertight by the 
pre-mounting of EPDM material

• 

Cables can be fed through the rails or 
attached using cable clips if preferred 

• 

Quality tested materials (10 years war-
ranty)

Self-tapping screws with seal, approved for use in 
general construction work 

Thread geometry designed 
for rapid tightening of 
screws 

Tip ensures that no 
shavings are produced 
when screws are tightened

Seal

Summary of Contents for trapeo

Page 1: ...Installation manual LORENZ trapeo LORENZ Solar module mounting system...

Page 2: ...all the safety instructions from page 10 before installing LORENZ trapeo for the first time Also please check out any new system components and functions of our mounting system Four pre drilled holes...

Page 3: ...ons 2 1 Test modules 6 2 2 Check inverters 6 2 3 Install safety devices 6 3 Mounting 3 1 Mounting the U shaped rails 7 3 2 Laying the cables 8 3 3 Mounting the modules 8 3 4 Connecting the modules 9 4...

Page 4: ...ect overview right from the start Very easy to use and totally reliable the software leads you through the process from identifying wind and snow load zones and how to enter your specific module layou...

Page 5: ...es to positioning the clamps Planning the distance between rails Option 1 short short standard 1 3Planning the mounting system The U shaped rails are available in 3 different lengths 139511000 U shape...

Page 6: ...The equipotenti al between the mounting system and the trapezoidal sheet roof is ensured in accordance with DIN VDE standards by using thin sheet metal screws Should the building have lightning protec...

Page 7: ...h points Screw the U shaped rail into place using the screws supplied until it is tight enough to create a secure seal recommended torque max 3 Nm Make sure that all U shaped rails are running in the...

Page 8: ...ollow the mounting instructions provided by the module manufacturer in order to ensure that any war ranty rights are protected This is particularly important when it comes to the positioning of fixing...

Page 9: ...ding on the number of modules in one string several hundred volts coud be achieved This could put life at risk Connect the solar modules to each other using the connection cables provided Check that t...

Page 10: ...ailure to do so can lead to injury and other damage Please keep these safety instructions close to hand The need for professional planning Before starting to construct the solar module mounting system...

Page 11: ...ork make sure you have all the necessary safety equipment Ensure too that all those involved in the work have been provided with and are observing the relevant safety instruc tions Please find below a...

Page 12: ...ransport of the original components or LORENZ Mounting System The buyer is here by bound to cover these costs 2 WARRANTY PERIOD The warranty is valid for a period of ten years beginning on the date on...

Page 13: ...ENZ in written form 7 MISCELLANEOUS If one regulation of this warranty declaration should be or become in valid the validity of the remaining regulations of the warranty shall remain unaffected An inv...

Page 14: ...zur bernahme dieser Kosten 2 GARANTIEZEIT Die Garantie ist g ltig f r die Dauer von 10 Jahren beginnend mit dem Datum des Vertragsabschlusses f r den Erstkauf des K ufers zur Montage des Montagesystem...

Page 15: ...r Form bei LORENZ geltend zu machen 7 SONSTIGES Sollte eine Bestimmung dieses Garantieversprechens unwirksam sein oder werden bleibt die Wirksamkeit der brigen Regelungen der Garantie davon unber hrt...

Page 16: ...ysteme GmbH Alfred Nobel Stra e 7 9 50226 Frechen Tel 49 0 221 126107 0 Fax 49 0 221 126107 19 www lorenz montagesystem de E Mail info lorenz ms de For errors or omissions we assume no liability Art N...

Reviews: