43
Operating Instructions
Original Document
Copyright © Loma Systems
4.7 Configuring the Metal Detector
Wherever possible, configuration of the metal detector will be carried out by Loma Systems
before the machine is dispatched, or by a Loma Service Engineer during a commissioning visit.
Primarily, the commissioning visit is required as part of the installation process so that the
engineer can optimise machine performance in its actual working environment and for the
products that are to be inspected.
There are circumstances, however, where it may be necessary for the end user to carry out some
or all of the configuration and commissioning procedures. Typically, this would occur when
Loma Systems do not have enough information about the end application, such as the belt
speed or reject details, to fully configure the machine.
Options and parameters available for configuring the metal detector are listed and described
below.
Summary of Contents for IQ3X
Page 2: ...Version Number Date Reason 1 29 07 2019 Initial Release ...
Page 28: ...Thispage intentionally left blank ...
Page 33: ...33 Operating Instructions Original Document Copyright Loma Systems 3 9 IQ3X Display Menu Map ...
Page 38: ...Thispage intentionally left blank ...