73
Operating Instructions
Original Document
Copyright © Loma Systems
4.23 Using Performance Validation
This section describes the benefits of the Performance Validation System and explains how to set
up the metal detector for PV testing, with information about each of the parameters that need
to be specified.
Regular checking of the metal detector’s sensitivity should be a normal part of any quality
assurance procedure. This is particularly important should it become necessary to demonstrate
due diligence to address customer or legislative requirements.
One approach is to make regular sensitivity checks and keep handwritten records of the results.
To assist in maintaining quality assurance controls the metal detector includes an automatic
Performance Validation System. This can be set up to automatically prompt the operator to
perform quality assurance checks on a regular basis. It then guides the operator through a test
sequence using standard test samples. At the end of the Performance Validation test the results
are saved in memory and can be outputted in a number of ways.
See the Logs and Reports section in the Reference Guide for further details.
4.24 Setting Up PV Testing
To use PV testing the PV Test option must be set to YES in the Menu > Service > Options menu. The
Menus > Set Up > PV Test Set Up menu will then become available.
A series of options the allow you to specify how the performance validation test operates and
these are described below.
The PV Test Set Up menu is not available if the Reverse Mode option has been set to
YES in the Menus > Service > Options menu.
To set up PV testing, proceed as follows:
1. Select Menus > Set Up > PV Test Set Up to display the PV Test Set Up menu options which are
listed and described below.
2. Use the Navigation Keys
to select each option in turn press the OK / Enter Key
to enable the value to be edited.
3. Use the Navigation Keys
to select the required option value and then press the
OK / Enter Key
to confirm the selection.
4. Repeat step 2 and 3 until you have selected and confirmed values for each option.
Summary of Contents for IQ3X
Page 2: ...Version Number Date Reason 1 29 07 2019 Initial Release ...
Page 28: ...Thispage intentionally left blank ...
Page 33: ...33 Operating Instructions Original Document Copyright Loma Systems 3 9 IQ3X Display Menu Map ...
Page 38: ...Thispage intentionally left blank ...