background image

English

47

14. COMMISSIONING 

The protocol for putting into operation is to be treated as a docu-
ment and serves as the basis for the warranty and guarantee terms.  
It is to be filled in completely, in particular the stove data and the 
addresses; the work to be performed is to be ticked off on comple-
tion. The signatories confirm with their signatures that all the points 
listed have been completed properly.
NOTE: Please return 1 completed protocol for putting into service to 
Lohberger.

Electrical periphery:

It is important that the connection socket in the electrical periphery 
is earthed. The operability of any room thermostat present must be 
checked. The execution of commands is to be established by pho-
ning in the case of a GSM modem.

Exhaust gas system:

The exhaust line, stove and combustion air inlet are part of the com-
bustion system as a whole; therefore the correct execution must also 
be checked. The plug connections should be tight in general since 
the system works with excess pressure. The exhaust tube has a dia-
meter of 100 mm which is sufficient for short distances. In the case 
of several changes in direction, the resistance of the exhaust system 
can increase with the flue to such an extent that the combustion 
quality suffers and/or noises arise from the greater flow speed. The 
exhaust line should be executed in DN 130 in this case. Determining 
the chimney draught with the unit switched off serves to assess the 
flue. If the draught is more than 15 Pa, then a draught limiter should 
be installed.

Stove functions:

These are the basic stove functions that are to be checked and ticked 
off. The stove is ready for operation if these functions are ensured.

Operator instruction:

This is one of the most important points in the putting into ope-
ration. It is very important that the operator understands the stove 
properly and is prepared to assume responsibility for the basic tasks 
required for operational safety. In particular the connection between 
special features of a biomass heating system and his obligations as 
well as the warranty and guarantee terms must be explained. e.g. 
non-tested pellets and screw jammers, lack of cleaning or main-
tenance and stove malfunctions. Thorough instruction can prevent 
many complaints.

Stove functions:

Explanation of the processes in the stove during ignition, normal 
operation, clean phase etc.

Control:

Explain operator’s possibilities to intervene, empty pellet contai-
ner, room thermostat, GSM modem, functions and settings, program 
times if necessary. Operating instructions: Handover and reference 
to the content to the following points, is a document.

Warranty terms:

Difference between warranty (statutory) and guarantee (voluntary), 
terms of guarantee, determination of wearing parts, reference to pel-
let quality to be used and the consequences of poor quality.

Cleaning instructions:

Ash and dust occurs with a biomass heating unit. The fire trough is 
to be cleaned every day with normal heating operation (particularly 
the air holes must be free from residues) and the space underneath 
the trough is to be suctioned out once a week. flue gas pipes are to 
be cleaned once or twice in the heating season depending on stove 
type; by a specialist company is best.

Maintenance:

Maintenance work after defined burn-off output is to be performed 
by a specialist company, including thorough cleaning.

Burning:

All doors must close tightly to prevent intake of false air.

Summary of Contents for INDALO

Page 1: ...Bedienungsanleitung mit Aufstellanleitung en Operating manual with installation instructions fr Manuel d utilisation avec instructions de montage it Istruzioni per l uso e l installazione Pelletkamin...

Page 2: ...2 A...

Page 3: ...UNIT FUNCTION 34 INTERNAL CONTROL UNIT 34 SIMPLE HEATING OPERATION EASY MODE THE FIRST STEPS 34 EASY OFF INACTIVE STATE 34 START IGNITION PROCESS 35 EASY 40 OPERATION 35 EASY 40 SWITCH OFF 35 EXTENDE...

Page 4: ...PROTOCOL FOR PUTTING INTO OPERATION 48 15 MENU NAVIGATION OVERALL VIEW 49 16 PROGRAMMING HEATING TIMES 51 17 AFTER SALES SERVICE 52 18 WARRANTY 52 Slight variations in colour due to printing process S...

Page 5: ...aging of your new stove provides excellent protection against damage In spite of this the stove and accessories can be damaged during transport Dimensions on page 2 The owner of small firing systems o...

Page 6: ...is new pellets are a standard sets new benchmarks in the Euro pean pellet market The traceability of pellets is ensured thanks to the use of identification numbers The pellet manufacturers pro duction...

Page 7: ...the operating functions that were set before the power failure are continued After a brief power failure the operating functions set prior to the failure are continued If the power failure lasts long...

Page 8: ...nefficient combus tion Note Please note that problems may arise due to updrafts in the case of combustion air supply from an integrated chimney ventilation shaft If the combustion air flowing downward...

Page 9: ...by trained specialist dealers or the service department Improper handling of these parts leads to the guarantee and warranty becoming null and void INTERNAL CONTROL UNIT All settings and functions ca...

Page 10: ...this is replaced by START after a brief time EASY xx appears in the display after the start phase xx stands for a value between 30 and 100 depending on output If switching off occurs again 50 sec wit...

Page 11: ...fort function currently visible HEAT AUTO or ROOM In addition to the basic functions of simple heating operation the LOHBERGER pellet stove provides extra comfort functions However be fore you can use...

Page 12: ...d here Men Pressing Men once changes to display INFO INFO Access to information menu various system parameters temperatures and operating information can be called up here Men Pressing Men once change...

Page 13: ...The menu item TIME AUTO only appears in connection with the room sensor and the wireless room sensor Please see the operating instruction enclosed for the option for setting the heating times Men TIM...

Page 14: ...active in connection with a room thermostat The lock function is switched on or off by using the or key All the parameters set are reset to factory values by using the I O key Men Men The C Fan funct...

Page 15: ...ion GSM Please see the operating instructions accompanying the Telephone option GSM for settings Men ROOM SET The room temperature displayed may deviate from the actual temperature and therefore the s...

Page 16: ...ay of total amount conveyed in kg pellets Display of conveyed pellet amount since the last cleaning and maintenance in kg pellets Men Men Men Men Men Tip grate contact contact open closed No motor dri...

Page 17: ...ay of operating status of flue gas blower ON or OFF Men FAN 00 Display of speed of flue gas blower Men C FAN ON Display of the operating status of the cross flow fan ON or OFF Men C FAN 00 Display of...

Page 18: ...s room sensor for more detailed informa tion TELEPHONE OPTION GSM Your pellet stove can also be started via a mobile phone as an additional option Please see the operating instructions for the tele ph...

Page 19: ...should be looked at to ensure that ash or clinker does not block the air feed openings The fire pan can easily be cleaned inside the stove After removing the pan the area underneath can be vacuumed c...

Page 20: ...AS FAN The flue gas fan and its flue tube connection should be cleaned at least 2 x a year or after approx 700 kg pellets In order to inspect the flue gas fan and to clean it remove four screws and pu...

Page 21: ...allschacht wurde erkannt Die Fehlermeldung kann durch gleichzeitiges Dr cken der Men und Taste solange bis die Fehlermeldung erlischt quittiert werden Bei Auftreten unbedingt Kundendienst verst ndigen...

Page 22: ...off The stove is ready for operation if these functions are ensured Operator instruction This is one of the most important points in the putting into ope ration It is very important that the operator...

Page 23: ...ed GSM modem present Room thermostat present Function checked Exhaust line chimney Diameter Connection leakproof Bends Chimney draught Stove functions Pellet container filled Grill dumps 360 and remai...

Page 24: ...et the day using the and key Set the month using the and key Set the year using the and key Men Men Selection of comfort function required HEAT AUTO ROOM by pressing the I O key Heating time Men Men M...

Page 25: ...f Display of operating hours Display of total amount conveyed in kg pellets Display of conveyed pellet amount since the last cleaning and maintenance in kg pellets Display of current software version...

Page 26: ...per day MO TU WE TH FR SA SU can be set Start heating period 1 ON1 Change with and button in 10 min steps Stop heating period 1 OFF1 Change with and button in 10 min steps Start heating period 2 ON2 C...

Page 27: ...thermal stress Seals e g hardening or breakage due to thermal or mechanical stress Surface coatings frequent cleaning or cleaning with abra sive cleaning agents Cast iron parts Cast parts subjected to...

Page 28: ...sche nderungen vorbehalten Ausgabe April 2012 made in Austria Gepr ft nach DIN EN 12815 und sterr Art 15a B VG Erf llung strengster Umweltauflagen wie zB Regensburger Stuttgarter Norm M nchner Verordn...

Reviews: