background image

45

04-00470

10 x – M10

10x – M10x80

HYDRAULIC HOSE

The hydraulic hoses shall be secured beneath 
the log bed on its route between the functions 
and the operating position. Using the brackets 
supplied, be sure to stretch the hoses so that 
they do not hang down between the brackets 
and ensure that they are not pinched so that 
the brackets cause wear to the hoses.

Fit the cable cover over the hoses on the part 
that is below the valves.

Securing hydraulic hose

The hydraulic hoses shall be secured beneath the 
log bed on its route between the functions and the 
operating position. Secure the hoses with the brackets 
supplied. Be sure to stretch the hoses, try to minimize 
the amount of hose hanging between the brackets and 
ensure that they are not pinched so that the brackets 
cause wear to the hoses.
At the operating position, hang up and secure the 
excess hose beneath the work platform with the straps. 
Assembly of the platform is on the next page.

Summary of Contents for B1001

Page 1: ...LOAD ROTATE GRIP 1 TOEBOARD SUPPORT REV 1 LOGOSOL B1001 HYDRAULIC Part no 0458 395 0691 USER MANUAL EN...

Page 2: ...ave demonstrated your confidence in us by purchasing this machine and we will do our utmost to meet your expectations LOGOSOL has been manufacturing sawmills since 1989 and in that time we have suppli...

Page 3: ...ce 7 Technical data 9 Component parts 10 Assembly 18 Connecting valve hydraulic cylinders 37 Hydraulic hose 45 Adjustment 47 First start up 48 Use 49 Transport 51 Exploded views 52 Hydraulic diagram 6...

Page 4: ...LOAD ROTATE GRIP 1 TOEBOARD SUPPORT 01 00584 01 00627 01 00556 00 00102 01 00560 00 00604 LOGOSOL B1001 HYDRAULIC DESCRIPTION OF THE MACHINE LOG LOADER IS OPTIONAL...

Page 5: ...equipment Wear heavy duty protective gloves Risk of cuts when handling the equipment KEY TO SYMBOLS WARNING This symbol means that you have to take particular care It is always accompanied by informa...

Page 6: ...raulic components and equipment Warning Do not exceed the maximum weights specified for the equipment Overload can entail sudden breakdowns making the work area dangerous Warning Pinch risk Do not rem...

Page 7: ...an oil leak Always turn the engine off before refuelling MAINTENANCE Periodic maintenance of the machine expected to be performed by the operator is described in this section Be sure to follow the sp...

Page 8: ...ctions for oil leaks Check the oil level Check the oil level in the hydraulic tank before each shift Follow the maintenance schedule in the engine instruction manual Check safety features Before each...

Page 9: ...stroke 300 mm Minimum clamp width 20mm Maximum clamp width 700 mm 01 00584 LOG SUPPORT Vertical stroke 305 mm Cylinder 150mm Quantity 2 Diameter of the support 40mm POWERPACK Output 3 kW 400 V CEE 16A...

Page 10: ...Allen screw partially threaded Hex bolt partially threaded Hex bolt Flange screw partially threaded Flange screw Carriage bolt Centre bolt Cross screw Slotted screw Locking screw Hex nut Flat washer...

Page 11: ...00 00102 div 01 00770 01 00617 Operator arm 01 00663 skp 01 00663 div 8310 302 0205 01 00766 04 00440 04 00478 01 00474 01 00718 01 00702 230v 400v 01 00703 Petrol 01 00624 Neu 00 00771 1001 The hydra...

Page 12: ...M8x75 4 x M10x20 6x M10x110 2x M10x130 1x M10x90 17 x M10 1x 03 02971 59 5mm 2x 03 03293 4x 03 02830 4x 03 02814 4x 03 02834 23 5mm 4x 03 02839 6x 03 02822 83mm 4x 8 5x12x11 12 x M8 2 x M8 2x 03 0284...

Page 13: ...5mm 3x 03 02878 77mm 2x 03 02879 35mm 01 00627 skp 01 00627 div 5 x M12x30 10 x M12 5 x M10 2 x M10x140 2 x M10x110 1 x M10x100 2 x M8 1 x M16 1 x M16x100 8 x M12 8 x M12x100 2 x 00 00771 1001 99 0077...

Page 14: ...3 02926 11 5mm 02 00483 4 x M10x35 8 x M10 2 x M10x70 2 x M10x100 1 TOEBOARD 01 00767 2 TOEBOARD 2x 2x 2x 2x 01 00684 skp 01 00684 B 1001 2x 02 00461 4x M12x90 4 x M12 4 x M12 01 00771 neu 1x 04 00534...

Page 15: ...3 03154 02 00458 04 00547 01 00766 04 00420 2 x 1 x M8x20 4 x M12x90 8 x M12 6 x M12 1 x M8 3x M12x90 01 00718 skp 6 x M8x14 10 x M10 6 x M12 2x M12x90 2x M12x25 10x M10x80 01 00766 skp 01 00770 skp 0...

Page 16: ...8 x M12 2 x M12x30 7 x M10 4 x M10x70 2 x M10x110 1 x M10x80 1x 03 02894 90 5mm 2x 03 02893 1x 04 00554 2x 03 02895 1x 04 00437 00 001634 skp 00 00102 skp 00 00692 skp 01 00102 div 00 00771 1001 2x 0...

Page 17: ...03 02902 02 00481 4x M12x90 6 x M12 4 x M8 8 x M12 8 x M10x20 20 x M10 2x M12x55 8x M10x30 4x M10x25 2x 03 03094 97mm 2x 03 03102 21 8mm 4x 04 00553 2x 03 03105 78mm 2x M12x130 2x M12x110 01 00663 skp...

Page 18: ...e log beds are positioned on pipes number 3 and 5 viewed in the sawing direction The beds are then placed on hole pattern 3 counted from the joint of the pipe in the sawing direction Count the hole pa...

Page 19: ...19 2 1 3 4 4 x M12x100 M12 4 x M12x100 4 x M12 4 x M12 1 x M10x100 1 x 03 02878 77mm 1 x M10 2 x BRB20 2 x SGA20 03 02878 77mm 01 00767 78 5mm...

Page 20: ...ke the task easier WARNING PINCH RISK In this section of the assembly there is a risk of injury through crushing so be careful and wear work gloves Note that the two toeboards should be mounted on eac...

Page 21: ...21 1 x M8 01 00584 4 3 2 x M12x25 5 x M8 1x 03 02820 61mm 03 02820 61mm 2 04 00539 1 x M8x20...

Page 22: ...75 1 x M8 2 x M8 2 x M10x20 1 x M10x110 1 x M10 1 x M10x110 1 x M10x90 M10x90 M10x110 2 x M10 2x DR 01467 2x 03 02839 1x 03 02822 83mm 2x 03 02830 2x 03 02814 1x 03 02822 83mm 1x 03 02971 59 5mm 03 02...

Page 23: ...x M10x110 M10x110 M10x110 1 x M10x130 M10x130 M10x130 2 x M10 1x 03 02843 100mm 2x 03 02834 23 5mm 2x 03 02842 29 5mm 1x 03 02822 83 mm 03 02842 29 5mm 03 02843 100mm 03 02822 83 mm 03 02834 23 5mm 8...

Page 24: ...en placed on hole patterns 3 and 4 counted from the joint on the pipe in the sawing direction Sawing direction We recommend laying out all fasteners on a tray or similar to make the task easier To be...

Page 25: ...25 5 01 00627 1 3 2 2 x M12x30 8 x M12x100 M12 4 x M12x100 M12 8 x M12 4 x M12 2 x M12x30 78 5mm 78 5mm 03 01976...

Page 26: ...M10 1 x M10x140 M10x140 1 x M10x110 M10x110 1 x M10x140 M10x140 3 x M10 2x 03 02878 77mm 2x 03 02879 35mm 1 x M10x110 M10x110 1 x M10x100 M10x100 1x 03 02868 105mm 03 02868 105mm 03 02879 35mm 03 028...

Page 27: ...27 6 7 2 x M8 1 x M12x30 1 x M16 1 x M16x100 01 00627...

Page 28: ...then placed on hole pattern 6 counted from the joint on the pipe in the sawing direction We recommend laying out all fasteners on a tray or similar to make the task easier To be able to mount new func...

Page 29: ...x M12 1 4 x M10x70 4 x M10 2 3 1 x M10x110 1 x M10 1x 03 02894 90 5mm 1 x M10x75 2 x M10 1 x M10x110 03 02878 77mm 03 02898 46 5mm M10x110 1x 03 02878 77mm 1x 03 02898 46 5mm 2x 03 02898 4 03 02894 90...

Page 30: ...2 1x 04 00437 5 6 00 00102 04 00435 04 00550 B751pro 7 Adjust the chain tension by releasing the screws holding the guide bar then tighten the chain using a chisel or a breaking bar Then re tighten th...

Page 31: ...pes number 3 and 5 viewed in the sawing direction Count the hole patterns from the pipe joint We recommend laying out all fasteners on a tray or similar to make the task easier To be able to mount new...

Page 32: ...32 4 x M10x20 4 x M10 1 2 x M12x100 M12 2 x M12 2 3 1 x M12x130 1 x M12 1x 03 03094 97mm 03 03094 97mm 4 x M10 1 x M12 78 5mm 8310 001 0205...

Page 33: ...33 04 00468 4 5 1 x M12x110 1 x M12 6 1 x M12 1 x M12x55 1x 03 03105 78mm 1x 03 03102 21 8mm 1 x M12 8310 001 0205...

Page 34: ...34 4 x M10 4 x M10x25 7 4 x M10 4 x M10x30 8 9 4 x M8x40 4 x M8 2 x 8310 001 0205...

Page 35: ...rt the next step the parts from the packages are needed 01 00560 We recommend laying out all fasteners on a tray or similar to make it easier to find screws To be able to mount new functions in the ra...

Page 36: ...36 1 x M8x20 1 x M8 1 2 3 x M12x100 M12 2 x M12 78 5mm 01 00718 01 00560 4 x M4 4 x M4 4 x M6x16 4 x M6 6 x M8x14 1 2...

Page 37: ...Connectors Connectors VALVE BLOCK Position of functions on the valve Four functions can be connected to the valve block The functions are connected into the lines with connectors Connect the respectiv...

Page 38: ...38 LOAD T P 1 2 01 00102 ROTATE 3 4 5 6 01 00584 2 TOEBOARD 7 8 2 8310 001 0205...

Page 39: ...lve to function properly a plug in the T 2 port needs to be removed Unscrew the cover remove the plug and replace the lid Parallel coupling valves For valve 2 to function properly it must be connected...

Page 40: ...unit The connection in the valves is the same for both units To facilitate connection of the hydraulic cylinders we define the connections as piston side and rod side Logosol recommends connecting the...

Page 41: ...wn Fit the hoses onto the hydraulic cylinder Note the location of the respective hose on the cylinder and valve The hoses connected to the piston side of the cylinder shall be connected to the piston...

Page 42: ...42 3 4 01 00627 1x 04 00441 04 00535 04 00532 04 00536 04 00531 1x 04 00442 6 5 GRIP 3 5 6 4...

Page 43: ...43 ROTATE 1 2 3 1 4 2 3 4 01 00102 7 8 7 8 01 00584 04 00440 04 00479 04 00475 04 00545 1 TOEBOARD 04 00474 04 00477 04 00481...

Page 44: ...44 04 00472 04 00471 04 00470 04 00470 LOAD 7 01 00604 7 8 8 2 TOEBOARD 5 6 5 6 01 00584 04 00478 04 00468 04 00481...

Page 45: ...er over the hoses on the part that is below the valves Securing hydraulic hose The hydraulic hoses shall be secured beneath the log bed on its route between the functions and the operating position Se...

Page 46: ...io in relation to the log bed Undo the screws that hold the log supports in the bed Note that the upper screw towards the centre of the rail should only be very slightly loosened Then use the knob to...

Page 47: ...s Adjusting chain tension In order for the log loader to work the foot must be adjusted so that it provides support against the ground Undo the screws and drop the foot down check the angle of the leg...

Page 48: ...p Warning Fire risk Hydraulic oil is flammable do not perform hot work in the vicinity of hydraulic components and equipment Warning Pinch risk Do not remain within the work area when the hydraulic cy...

Page 49: ...49 GRIP GRIP SUPPORT 1 TOEBOARD USE If the functions have been connected as described the function shall be as in the illustrations below...

Page 50: ...50 ROTATE ROTATE LOAD 2 TOEBOARD USE...

Page 51: ...n transport position Transport position for the log loader If the machine has a trailer kit and is to be transported check that everything on the machine is secure The following hydraulic functions mu...

Page 52: ...sive property of Logosol AB and may not be copied reproduced transmitted or communicated to a third part or used for any purpose without written permission Reviewed by 01 00627 2021 03 02 13 56 Log cl...

Page 53: ...53 01 00560...

Page 54: ...54 01 00556...

Page 55: ...55 01 00584...

Page 56: ...56 01 00644...

Page 57: ...o a third part or used for any purpose without written permission Reviewed by 01 00641 2021 12 02 12 56 Log support guide asm IronCAD 2D drawing 3D file available Made a new part nr for what we assemb...

Page 58: ...16 and 03 02838 updated New Issue User Old Issue Date Remarks 2 ES 1 15 01 20 21 Garp no 4 3 13 8 16 2 1 10 13 12 6 5 9 7 11 8 11 9 5 16 6 16 10 2 14 15 15 17 17 LM6M M8 Lock 1 LM6M M8 Lock nut with n...

Page 59: ...59 01 00672...

Page 60: ...60 01 00634...

Page 61: ...61 01 00692...

Page 62: ...62 01 00604...

Page 63: ...o be under powered Low oil level in the tank Leakage in the system Air in the system Damaged hydraulic cylinder Check the oil level in the tank Re tighten loose couplings Replace damaged hoses Run the...

Page 64: ...B1001 B751 has been manufactured in conformity with Machinery Directive 2006 42 EC EMC Directive 2004 108 EU and has been manufactured in conformity with the following harmonised standards EN ISO 121...

Reviews: