Installation & Start-Up
3
3.1
INSTALLATION
Refer to the installation diagram on the next page. The diagram gives the exterior dimensions of
the High Intensity Cure Chamber and the Power Supply. Allow six inches of clearance around
the unit for air circulation and cable connections. Air is drawn from the bottom of the Chamber
and exhausted from the top out of the exhaust duct. Do not block air inlets.
Power requirements and the plug formats for the power cords are shown. Prior to applying
power, the Mercury Arc Lamp must be installed. Refer to page 7 Lamp Installation and
replacement. Install Lamp. The Lamp is a 1,500 watt Mercury Arc Lamp.
Connect all cables as shown in the Installation diagram.
A five inch exhaust connection is provided and should be connected as described in the
installation diagram.
After plugging in the Cure Chamber and The Mercury Arc Power Supply proceed to the
operating instructions.
5
984135 Zeta 7215 & 7216 manl 8/3/00 3:23 PM Page 7