8
8.0
COMMISSIONING AND TESTING
8.1
Electrical Installation
Any ancillary item that requires an electrical supply should be installed and commissioned as per instructions.
8.2
Water Connection
For design, see Section 5: Water connections
The system should be thoroughly flushed out with cold water without any circulating pumps in position.
Ensure all the valves are open.
8.3
Primary Heat Source
The primary heat source operating in conjunction with the LBT Thermal store should be installed and commissioned in
accordance with the relevant ICM Instructions provided.
8.4
Commissioning Check List
Failure to follow and complete the commissioning procedure and checklist will invalidate all warranties.
See page
for checklist