Instruction manual CH
17
is
3
Installation
Warning
The installation must be carried out by an approved installation engineer in
compliance with the general and local regulations imposed by the gas, water
and power supply companies and the fire brigade.
The appliance may only be installed in a room that complies with the
requirements stated in national and local ventilation
regulations
(1.3 "Regulations")
.
3.1
Introduction
This chapter describes the installation activities to be carried out before the
appliance may be started up
(9 "Starting the water heater")
, in particular:
•
Packaging
;
•
Ambient conditions
;
•
Technical specifications
;
•
Vented water connections
;
•
Vented water connections
;
•
Gas connection
;
•
Flue gas discharge
;
•
Electrical connection
;
•
Checking the supply pressure and burner pressure
.
For a possible conversion to a different gas category, see
conversion
(4 "Conversion to a different gas category")
.
3.2
Packaging
To avoid damaging the water heater, remove the packaging carefully.
We recommend unpacking the water heater at or near its intended location.
Caution
The water heater may only be manoeuvred in an upright position. Take care
that the water heater is not damaged after unpacking.
Summary of Contents for CH 100 CE
Page 4: ...4 Instruction manual CH gis...
Page 10: ...Introduction 10 Instruction manual CH 1 gis...
Page 16: ...Working principle of the water heater 16 Instruction manual CH 2 gis...
Page 36: ...Conversion to a different gas category 36 Instruction manual CH 4 is...
Page 44: ...Status of the water heater 44 Instruction manual CH 8 gis...
Page 46: ...Starting the water heater 46 Instruction manual CH 9 gis...
Page 48: ...Shutting down 48 Instruction manual CH 10 gis...
Page 62: ...Electrical diagram 62 Instruction manual CH 14 is...
Page 64: ...Declaration of Conformity 64 Instruction manual CH 15 is...