USER GUIDE 

PF-2223-1 

3-Phase 22.5kW Power System 

 

PF-2223-1-UG-01 

Page 5 of 12

 

June 2015 

The Power Shelf slides into a 21-inch OCP rack and is supported in the rack by shelf support brackets. If the 
Shelf Support Brackets are not already installed in the rack, follow instructions “Shelf Support Brackets 
Installation” on page 5 to install the brackets. 

Before the Power Shelf is installed into the rack, Linking Bus Bars are loosely installed on the rear of the 
Power Shelf; they are tightened after the Power Shelf is mounted into the rack. Follow instructions 
“Linking Bus Bar Installation” on page 5 to install linking bus bars. 

Shelf Support Brackets Installation 

The weight of the power shelf is supported in the rack by two Shelf Support Brackets. Each bracket is held 
in place by four M6 x 12mm self-threading screws. 

To Install the Shelf Support Brackets: 

1.

 

Place a Shelf Support Bracket in the correct position in the rack and loosely attach it to the shelf 

with four M6 screws. 

2.

 

Place the other Shelf Support Bracket in the correct position in the rack and loosely attach it to the 

shelf with four M6 screws. 

3.

 

Torque all Shelf Support Bracket screws to 6.1 N-m (4.5 ft-lbs). 

Linking Bus Bar Installation 

Linking Bus Bars are installed, but not tightened, to the output power connectors on the rear of the Power 
Shelf before it is mounted into the rack. After the Power Shelf is installed in the rack, the other ends of the 
Linking Bus Bars are connected to the rack bus bars and their bolts are tightened then. Linking Bus Bars 
may be color coded: red for +12V and black for ground. 

Caution 

If the Linking Bus Bars are color coded, ensure that they are installed on the correct bus 

that corresponds with its color. 

 

To Install Linking Bus Bars to the Power Shelf: 

1.

 

With four M8 x 15mm SEMS bolts, install a Linking Bus Bar to an output power bus bar on the 

Power Shelf, but do not tighten the bolts. These bolts will be tightened later after the Power Shelf 

is mounted into the rack. 

2.

 

Install the remainder of Linking Bus Bars to the bus bars on the Power Shelf, but do not tighten the 

bolts. The Power Shelf is now ready to be installed into the rack. 

Power Shelf Installation 

After the Shelf Support Brackets are installed into the rack and the Linking Bus Bars are installed on the 
rear of the Power Shelf, it can be installed into the rack. 

WARNING

 

To prevent risk of electrical shock to personnel, ensure that power is not activated inside 

the rack while installing equipment. Use a DMM to test any potentially live wires and 

verify that electrical power is turned off to the rack. 

 

Summary of Contents for PF-2223-1

Page 1: ...3 Phase 22 5kW Power Supply System USER GUIDE PF 2223 1 UG 01 Page 1 of 12 June 2015...

Page 2: ...mentioned herein are for identification purposes only and may be the trademarks of their respective holder s Specifications and data are subject to change without notice Contents Introduction 3 Gener...

Page 3: ...initial startup refer to the Lite On 3 Phase 22 5kW Power Supply System Startup Guide General Safety This user guide uses the safety conventions described below Ensure that you follow the safety inst...

Page 4: ...ipping To unpack items from cardboard shipping boxes 1 If necessary remove any shipping straps from around the box 2 Place the box upright and cut through the tape on the top of the box 3 Remove the i...

Page 5: ...Bar Installation Linking Bus Bars are installed but not tightened to the output power connectors on the rear of the Power Shelf before it is mounted into the rack After the Power Shelf is installed i...

Page 6: ...the Power Shelf is connected to the rack bus bars via Linking Bus Bars At this point in the installation the Linking Bus Bars should already be connected to the Power Shelf bus bars but not yet tight...

Page 7: ...om Phase A L1 and the right three C13 receptacles receive power from Phase C L3 C13 Receptacles as viewed from rear of Power Shelf Phase A Input Power Left three C13 receptacles same voltage as Phase...

Page 8: ...the load on the C13 receptacles when balancing phases As shown below PSUs are held in place with a spring latch To install a Power Supply Unit 1 Slide a PSU into an empty slot of the Power Shelf until...

Page 9: ...Vout_UV_Fault Solid Green Solid Yellow LATCH_SD Solid Green Solid Yellow SCP_Fault Solid Green Solid Yellow STB_UV_Fault Solid Green Solid Yellow STB_OV_Fault Solid Green Solid Yellow STB_OCP_Fault S...

Page 10: ...ion Optional The optional Battery Backup System BBS is a separate shelf with multiple slots for Li ion Backup Battery Units BBUs that provides DC backup power for the Power System WARNING To prevent r...

Page 11: ...elf BBS port to one of the communication ports on the BBS 9 Turn on power to the shelf Warranty If you experience any problems with your Lite On equipment contact Lite On Power Systems Solutions at 1...

Page 12: ...69 331 9838 www liteon pss com email pss sales liteon com Lite On Power System Solutions No 90 Chien 1 Rd Chung Ho Dist New Taipei City 23585 Taiwan 886 2 2226181 ext 5026 www liteon pss com email pss...

Reviews: