background image

 

USER GUIDE 

PF-2223-1 

3-Phase 22.5kW Power System 

 

PF-2223-1-UG-01 

Page 11 of 12

 

June 2015 

3.

 

Place the other BBS Support Bracket in the correct position in the rack and loosely attach it to the 

shelf with two M6 x 12mm self-threading screws. 

4.

 

Torque the screws to 6.1 N-m (4.5 ft-lbs). 

5.

 

Slide the BBS into the rack. 

6.

 

Using two M8 x 18mm SEMS bolts, connect each BBS bus bar to corresponding bus bars in the 

rack. 

7.

 

Torque the bus bar bolts to 17 N-m (12.5 ft-lbs). 

8.

 

Connect a supplied BBS communication cable from the Power Shelf BBS port to one of the 

communication ports on the BBS. 

9.

 

Turn on power to the shelf. 

Warranty 

If you experience any problems with your Lite-On equipment, contact Lite-On Power Systems Solutions at 
1-469-331-9838. 

Related Documentation 

For information about the 22.5kW Power Shelf, refer to the 

Lite-On 22.5kW Power Shelf Datasheet

For information about the 2.5kW Power Supply Unit, refer to the 

Lite-On 2.5kW Power Supply Unit 

Datasheet

For instructions on initial startup of the 3-Phase 22.5kW Power Supply System, refer to the 

Lite-On 3-Phase 

22.5kW Power Supply System Startup Guide

For more information related to the Lite-On Power Systems, visit the Lite-On Power Systems Solutions web 
site at: 

http://www.liteon-pss.com

 

Summary of Contents for PF-2223-1

Page 1: ...3 Phase 22 5kW Power Supply System USER GUIDE PF 2223 1 UG 01 Page 1 of 12 June 2015...

Page 2: ...mentioned herein are for identification purposes only and may be the trademarks of their respective holder s Specifications and data are subject to change without notice Contents Introduction 3 Gener...

Page 3: ...initial startup refer to the Lite On 3 Phase 22 5kW Power Supply System Startup Guide General Safety This user guide uses the safety conventions described below Ensure that you follow the safety inst...

Page 4: ...ipping To unpack items from cardboard shipping boxes 1 If necessary remove any shipping straps from around the box 2 Place the box upright and cut through the tape on the top of the box 3 Remove the i...

Page 5: ...Bar Installation Linking Bus Bars are installed but not tightened to the output power connectors on the rear of the Power Shelf before it is mounted into the rack After the Power Shelf is installed i...

Page 6: ...the Power Shelf is connected to the rack bus bars via Linking Bus Bars At this point in the installation the Linking Bus Bars should already be connected to the Power Shelf bus bars but not yet tight...

Page 7: ...om Phase A L1 and the right three C13 receptacles receive power from Phase C L3 C13 Receptacles as viewed from rear of Power Shelf Phase A Input Power Left three C13 receptacles same voltage as Phase...

Page 8: ...the load on the C13 receptacles when balancing phases As shown below PSUs are held in place with a spring latch To install a Power Supply Unit 1 Slide a PSU into an empty slot of the Power Shelf until...

Page 9: ...Vout_UV_Fault Solid Green Solid Yellow LATCH_SD Solid Green Solid Yellow SCP_Fault Solid Green Solid Yellow STB_UV_Fault Solid Green Solid Yellow STB_OV_Fault Solid Green Solid Yellow STB_OCP_Fault S...

Page 10: ...ion Optional The optional Battery Backup System BBS is a separate shelf with multiple slots for Li ion Backup Battery Units BBUs that provides DC backup power for the Power System WARNING To prevent r...

Page 11: ...elf BBS port to one of the communication ports on the BBS 9 Turn on power to the shelf Warranty If you experience any problems with your Lite On equipment contact Lite On Power Systems Solutions at 1...

Page 12: ...69 331 9838 www liteon pss com email pss sales liteon com Lite On Power System Solutions No 90 Chien 1 Rd Chung Ho Dist New Taipei City 23585 Taiwan 886 2 2226181 ext 5026 www liteon pss com email pss...

Reviews: