6
IMPORTANT NOTICE
tting this product please read and understand the following:
By commencing testing and installation of the unit you are agreeing to the Terms and Conditions
set out by us and copies are available by contacting us by telephone (details on the cover of this
manual).
You are required to ensure the purchased product dimensions allows for ease of passage to the
intended installation area.
Regarding weight tolerances of installation area, it is advisable to contact a builder or refer to
oor support.
1. It is important that you ensure that your purchase has been delivered undamaged. You are required to
check the contents and report any damage that you feel needs repairing or replacing within 48hrs of
receipt of goods. Items reported damaged after this time WILL be chargeable.
ed specialist. The product requires connection to
ed electrician.
3. We are a supply only company. If you report to us any damage we will send replacements or solutions to
remedy the problem described. We endeavor to fully understand th
rst by asking a series of
questions and then propose the solution. We may even ask for digital images to be sent via email to assist
the process.
tter
fully tests the unit upon completion and attends to any leaks and faults before he leaves.
tted for
transport purposes and need to be properly sealed and tightened before use. During transportation
some connections can become dislodged and therefore break any watertight seal, you are required to
x accordingly.
6.
tter until you have inspected the unit. We cannot be held responsible for delays
7. We cannot be held liable for inconvenience caused due to lack of bathing facilities caused by any delay in
receiving your product or whilst awaiting parts.
8. Regarding our sales and technical support: We know our products and their requirements, but we are not
suitability of the product with a professional body. It is the customer responsibility to ensure the product
t for purpose.
The best advice we can offer our customers when they ask “what is the best way to build this” is to follow the
instructions and perform a dry run to ensure you are confident with the build and you understand fully how
the unit is assembled. When we use the term “
DRY RUN
” this means you do not silicone anything, just simply
construct the shower, align, drill and screw everything together. Once you are happy with the build take the
unit apart and carry out the full installation, using your silicone sealer at all points outlined in the manual.