1. Tub Base with waste assembly and fl exible waste pipe
i
f-
e
r
p
m
e
t
s
y
s
d
n
a
p
m
u
p
l
o
o
p
lr
i
h
W
.
d
e
t
t i
f-
e
r
p
tted.
2. Two straight metal sections and two curved rail sections
nish (Front Frame).
3. Thermostatic shower valve and 2 braided hoses.
Monsoon maybe included)
ttings.
6. Two Long Flapped seals and two slightly shorter, plus a
pair of Magnetic door seals.
7. Tower with and Body Jets electronic control panel.
at clear glass side pieces.
er in appearance). (Fits into Pre-cut Hole in Ceailing)
11. Two white glass, frames rear panels.
xings.
xing screws and cover caps. (May Be Pre-Fitted)
14. Two pairs of door handles.
xings.
(quick release) cam wheels. (May Be Pre Fitted)
12
14
15
11
13
Please check you have all these parts and they
are in a condition suitable to install BEFORE you
commence installation. We accept no responsibility
for delays due to waiting for replacement to arrive.
16
5
16