background image

28

29

daTa CoMMunICaTIons

rs-232 and rs-485 Communications 

The LCR 600 is capable of interfacing with RS-232 and R-S485 communication protocols. Data connections for these 

protocols is made at the J2 and J3 terminal blocks. A jumper, located on the left side of the CPU board, can also affect 

communication protocol; however, it must remain in the B position for all LCR 600 applications. See note and diagram 

below. 

PRINTER

SERIAL 485

TERMINAL

POWER

COUNTER

MH1

CTS RXD TXD RTS

GND

GND

485+A

485-B

CTS RXD TXD RTS +VP

EARTH

AUX OUTPUTS

PULSE INPUTS

AUX I/O

GND

GND

GND

IN 1

OUT1

OUT2

OUT3

TEMPERATURE PROBE

ASSY

84040 REV.

RTD+S

RTD-D1

RTE-S

RTD+D

OUT4

OUT5

IN 2

IN 3

IN 4

+5V OUT

+VP

+VP

PGND

OUT6 +VP

SOL

+VP

PGNDOUT7

+VF

+VF

IN5

OUT8

GND

GND

+12-24V

ACC

MH4

C1

J20

J6

J3

J2

J1

J7

J12

J15

P1

TP1

J5

J14

J18

J19

J10

J17

J11

J7

C2

MH5

MH3

MH2

A

B

11

10

1213

52

53

54

55

56

A

B

A

B

J2 (RS-485)

J3 (RS-232)

A Position

B Position

24

25

The LCR 600 is shipped with the jumper in the B position. Keep it there. 

There are no cases in which it must be moved to the A position.

Keep the B Position

Power Installation overview 

When you have made all of the data connections and finished installing the components, connect the power to the 

LCR 600 and the Epson printer. Before making the power connections, go through the vehicle system checklist below, 

and ensure that the electrical system of the truck meets the minimum requirements for powering the LCR 600 and the 

Epson printer.

vehicle system Checklist

 

□  Clean any corrosion from the battery terminals and battery cable to guarantee a solid, tight connection.

 

□  Charge the battery in accordance with the manufacturer’s specifications.

 

□  Ensure the alternator is large enough to meet the total demands of the truck, including the LCR 600. The   

 

LCR 600 requires a minimum of 5 A for proper operation. Run the truck at low idle with all accessories on   

 

(including hose reel), and check the voltage with a multi-meter. The voltage should not drop below 11 V.

 

□  Inspect the electrical equipment on the vehicle, and ensure it is properly installed and operating correctly.

 

□  Determine whether the vehicle is grounded positively or negatively. Consult Liquid Controls if the vehicle 

 

 

has a positive ground.

 

□  Make sure that any radio antennas are installed in accordance with the manufacturer’s specification to    

 

prevent RF interference.

PoWer InsTallaTIon 

The J2 terminal block is 

permanently attached to the 

CPU board.

Do Not Try To Remove J2

Summary of Contents for LectroCount LCR 600 E3708 Series

Page 1: ...LectroCount LCR 600 Installation Parts Liquid Controls An IDEX Energy Fuels Business Installation EM150 12 E3708 E3709 Series S3 ...

Page 2: ...s Class 2 power supply or an isolation power source and overcurrent protective device rated 5 Amp max are required to be installed in the field Pour être conforme aux exigences UL une alimentation électrique de classe 2 ou une alimentation électrique isolée et comportant un dispositif de protection contre la surtension de 5 ampères ou moins sont requises pour l installation Peripheral equipment mu...

Page 3: ...ions LectroCount housings directly mounted to the meter are attached to the earth ground through the meter via the tank and the tank piping which is grounded by the electrical system grounding rods Division 1 fixed installations typically require metal conduit to the conduit hubs for the wiring The metal conduit provides the necessary ESD protection Divison 2 installations can ground the LectroCou...

Page 4: ... Class I Potentially Explosive Gas Vapor Atmospheres Division 2 Gases and vapor are not normally present in an explosive concentration but may accidentally exist during abnormal operations Groups C D Flammable explosive Gas groups T6 Temperature class for surface temperature limitations T6 is 85º C 40 C Tamb 70 C Safe limits of ambient temperature IP66 and NEMA 4 Ingress protection dust tight and ...

Page 5: ...fer product delivery and ticket generation Metrological data collection Presetting by volume Multiple production selection Four delivery screens Security settings Air and vapor elimination with proper accessories Valve control with proper accessories Electronic temperature volume compensation ETVC with proper accessories POS Upgrade Functions Cash and volume discounting Multiple tax structures Pri...

Page 6: ... and a 9 pin connector for your PC can also make the connection but requires opening the LCR 600 Installation Overview Installation Overview If the LectroCount LCR 600 was ordered as part of a meter system it will arrive mounted on the meter and prewired to the ETVC probe air eliminator and valve Installation overview for LCR 600 ordered with meter system 1 Ground truck seat cushion Page 12 2 Inst...

Page 7: ...ers should penetrate any paint to ensure a good electrical connection Ensure a Good Ground 6 1 2 3 3 5 8 4 9 LectroCount Ground Strap Kit 82185 Install the LectroCount Ground Strap Kit before installing the LectroCount register ESD Precaution Some truck seats typically passenger seats are not adjustable and do not require grounding Grounded Passenger Seats Typical Adjustable Truck Seats Ground Che...

Page 8: ...ep until the product stops draining from the differential valve and discharge line valve nozzle 8 Leave the discharge line valve nozzle open while working on the system 1 Close the belly valve of the supply tank 2 Close the valve on the vapor return line 3 Close the manual valve in the supply line on the inlet side of the meter If no manual valve exists on the inlet side consult the truck manufact...

Page 9: ...tions the cables must be routed from the back of the truck where the LCR 600 is installed to the front of the truck where the accessory panel is and the printer is typically installed The black data cable connects to the printer typically mounted in the truck cab The gray power cable hooks up to a power source During installation follow these guidelines and ensure the cables remain undamaged Guide...

Page 10: ... 11 Solenoid Operated Block Valve A2859 11 Block Valve and 3 Way Solenoid PN 81527 Single Stage Systems Liquid Controls Valves Overview When ordered as part of a meter system with a LCR 600 Liquid Control s control valves are bolted onto the meter and wired to the LCR 600 at the factory Electronic control valves can also be ordered separately and retrofit onto meter systems already in service Thes...

Page 11: ...nd close a V 7 valve These valves are typically used in high viscosity applications like lube oil E 7 Valve A2859 11 Solenoid Operated Block Valve and 3 Way Solenoid PN 81527 A2848 11 Solenoid Operated Block Valve Valves Solenoid 1 Wiring for Single Stage Valves Solenoid 1 and Solenoid 2 Wiring for A2859 11 and 3 Way Two Stage 2848 11 Two Stage and E 7 Two Stage Disconnect the power before working...

Page 12: ...of a meter system with a LCR 600 Liquid Control s optical air and vapor eliminators are bolted onto the strainer and wired to the LCR 600 at the factory Optical air and vapor eliminators can also be ordered separately and installed onto meter systems already in service For mechanical installation instructions refer to the manual specific to the optical air and vapor eliminator Instructions for wir...

Page 13: ...l board PN 81944 that mounts directly to the LCR 600 CPU board Typically a P transducer operates in conjuction with a shutdown device such as a valve or a dead man The shutdown control must be wired to the LCR 600 and should draw no more than 1 A To wire P Transducer to the LCR 600 1 Unplug the J1 and J3 terminal blocks from the LCR 600 CPU board 2 Remove the screw at the top left corner of the LC...

Page 14: ...printer or roll printer Installation is the same for both printers LCR 600 s are typically shipped with a black sheathed data cable prewired to terminals J1 and J3 on the LCR 600 CPU board To install the printer 1 Find a convenient mounting spot in the truck cab where drivers can easily operate the printer 2 Clean the mounting spot and the bottom of the printer with alcohol for the best stick 3 At...

Page 15: ...de all of the data connections and finished installing the components connect the power to the LCR 600 and the Epson printer Before making the power connections go through the vehicle system checklist below and ensure that the electrical system of the truck meets the minimum requirements for powering the LCR 600 and the Epson printer Vehicle System Checklist Clean any corrosion from the battery te...

Page 16: ...stalled check to make sure that it powers up correctly The LCR 600 display and the printer power light should come on when the truck s ignition is turned to the ON or to the ACC position Make sure the printer power switch is on If the LCR 600 or the printer does not power up check the wiring and the connections on the LCR 600 CPU board against the manual 4 Connect the red wire to the direct power ...

Page 17: ... in the counter bore of the casting covered with the flat washer provided and held in place with the cotter pin provided The control switch on the front of the LCR 600 is also sealed with an O ring and held in place by a bushing secured with three socket head cap screws When replacing a control switch in the field make sure the O ring is in place on the switch shaft before reinstalling the switch ...

Page 18: ... Screw 8 32 x Bill Of Materials Bill Of Materials Internal Components Pulser Field Install Kit 82597 09380 Nylon Washer 2 81994 PULSER 100 PPR Pulser Field Install Kit 82597 08189 Flat Washer 08201 O ring 2 Bill Of Materials 840405 CPU Board Optional Items not shown Description Part Number Lap Pad Adapter 81514 Roll Printer Extension Cable 71237 Flash Cable 81885 81324 J1 5 Pin Connector 81456 J3 ...

Page 19: ... 2014 Liquid Controls Pub No 500393 11 14 105 Albrecht Drive Lake Bluff IL 60044 2242 1 800 458 5262 847 295 1050 Fax 847 295 1057 www lcmeter com ...

Reviews: