•  the front plasterboards layers are fixed using long enough screws 

to pass through the lower plasterboard and attach to the steel pro-

file underneath.

1.  Plasterboard thickness 12,5 mm

2.  Rock wool density up to 100 kg/m³ (optional)

3.  Reinforcement sheet

4.  Horizontal U-shaped profile

5.  Vertical C-shaped profile

6.  Self-drilling screw Ø 3,5 X 25 mm

7.  Self-drilling screw Ø 3,5 X 35 mm

 

†

Gypsum blocks light walls

Gypsum blocks wall can be built with special solid gypsum blocks 

with interlocking shaped edges as indicated in the supplier's in-

structions and according to the following characteristics:

•  minimum thickness 70 or 100 mm according to the type and resi-

stance class required;

•  minimum density 995 kg/m³.

It is generally advisable to first build the wall and then provide the 

opening for the fire damper.

 

†

Aerated concrete floors

Aerated concrete floors can be built during installation or with pre-

formed slabs with interlocking shaped edges according to the fol-

lowing characteristics:

•  minimum thickness 100 or 150 mm according to the type and re-

sistance class required;

•  minimum density 650 kg/m³

 

†

Poured concrete floors

Poured concrete floors can be built during installation or with pre-

formed slabs with interlocking shaped edges according to the fol-

lowing characteristics:

•  minimum thickness 100 or 150 mm according to the resistance 

class required;

•  minimum density 2200 kg/m³.

 

„

Installations within vertical rigid wall

Refer to the section Construction supports characteristics  for further 

information.

Comply with the minimum distances indicated on section Minimum 

distances .

Before and after installation please perform a functional test. Refer to 

section Mechanism type for further information .

 

†

Wall opening

A opening must be provided in the wall as indicated in the table and 

in the drawing

 

†

Damper positioning

Position the damper in the opening so that the side of the closing 

mechanism extends as indicated in the table and in the drawing.

Close the blade before installing the fire damper.

 

†

Filling

Fill the space between the wall and the damper as indicated in the 

table and in the drawing.

Sealing with concrete is not allowed.

Fire resistance classification 

“D” hole size

[mm]

Damper protrusion from 

the wall “E”

[mm]

Wall minimum thickness “S”

[mm]

Sealing

EI 90 S Installation within vertical rigid wall 

Wall minimum density 500 kg/m³

EI 90 S

(500 Pa)

Da (Ø + 35) x (Ø + 35)

to (B + 50) x (H + 50)

(square hole)

215 + Lp

100

Rock wool 100 kg/m³ 

with infill plasterboard 

(thickness 12.5 mm)

EI 120 S Installation within vertical rigid wall 

Wall minimum density 500 kg/m³

EI 120 S

(500 Pa)

From Ø + 25

to Ø + 580

(square or circular hole)

215 + Lp

100

Mortar or plaster putty 

sealing

rev 20-10

11

We reserve the right to make changes without prior notice

Summary of Contents for WH45 Series

Page 1: ...ww mp3 italia it 1MUBWH45EN rev 20 10 1MUBWH45EN WH45 WH45 l indab we simplify co nstruc tio n www lindab com Fire dampers are manufactured by MP3 Srl www mp3 italia it 1MUBWH45EN LIND rev 20 10 1MUBW...

Page 2: ...cal light wall gypsum blocks wall Wall minimum thickness 70 mm Wall minimum density 995 kg m Plaster putty sealing ve i o W min 200 max 800 min 200 max 800 min 200 max 800 EI 120 S Installation within...

Page 3: ...ade position open or closed Refer to Electrical connections paragraph for more details Closing by remote control With power supply input or interruption magnet WH45M version only Temperature calibrati...

Page 4: ...sup plied to the motor Position indication microswitches The motorized versions are supplied with two microswitches to show the blade s position open or closed Refer to the section Electrical connect...

Page 5: ...ollows Check that the voltage and electrical frequency are equivalent to those of the motor of the servomotor check the motor s informa tion label Make the connections as shown in the below diagram 1...

Page 6: ...W Motor 230V AC WH45DPS WH45DSS Siemens GNA326 GRA326 Opening 4 5 W In stand by 3 5 W 24V AC DC motor WH45VGS Siemens GGA126 Opening 6 W In stand by 1 5 W 230V AC motor WH45DGS Siemens GGA326 Opening...

Page 7: ...ance with national legislation For electrical and electronic parts also refer to EU Directive 2011 65 INSTALLATION The sizes shown are in mm It is recommended to perform a functional test before Insta...

Page 8: ...echanism side 2 Mechanism opposite side 3 End cap with mesh L1 End cap length mechanism side L2 End cap length mechanism opposite side Fire damper nominal diameter Length of end cap with mesh dependin...

Page 9: ...floor Installation a mm b mm c mm d mm Rigid wall EI 90 S Installation within vertical rigid wall Plasterboard and rock wool 100 kg m sealing 50 75 EI 120 S Installation within vertical rigid wall Mor...

Page 10: ...pacing of 625 mm between each other vertical profile fixing with selfthreading screws or by clinching to the bottom horizontal profile and insertion in the top horizontal profile profiles fixed using...

Page 11: ...ol lowing characteristics minimum thickness 100 or 150 mm according to the resistance class required minimum density 2200 kg m Installations within vertical rigid wall Refer to the section Constructio...

Page 12: ...for further information Wall opening A opening must be provided in the wall as indicated in the table and in the drawing Damper positioning Position the damper in the opening so that the side of the...

Page 13: ...l as indicated in the table and in the drawing Damper positioning Position the damper in the opening so that the side of the closing mechanism extends as indicated in the table and in the drawing Clos...

Page 14: ...he drawing Sealing with concrete is not allowed Fire resistance classification D hole size mm Damper protrusion from the floor E mm Floor minimum thickness S mm Sealing EI 90 S Installation within flo...