31) Turn the building around. You will notice messy cables from the
billboard lights hanging down from the other side.
We will hide these by rst removing the grey Lego walls of the roof,
laying the cables in between the black Lego studs below, and then
reconnecting the grey walls over the top. Do this as much as required to
ensure cables are neatly secured and out of the way.