30.) Reconnect the main roof section back to the rest of the building
ensuring that all cables are pushed behind their lights and over the
front wall. This part is a little tricky and may take a few goes to ensure
all cables are hidden behind and the roof is fully connected to the top of
the walls. Be patient, you will get there.