Lift the main section so that underneath of the roof is facing us. Hide
the cables from the billboard lights underneath the grey Lego plates by
rst removing them and then reconnecting them over the cables
ensuring they are laid in between studs.
This now completes the roof lighting. We won’t connect these to 12-
port expansion board as yet, as this will happen when we connect the
roof back after the next section of lights are installed.
26.) Let’s move on to the next section of the building. Remove the
following Lego bricks and then disconnect the long blue section which
connects across the length of the wall.