18.) Take a 15cm cable and connect it into a spare port on the
expansion board.
19.) We can test our current lighting circuit as you go by simply turning
on the battery pack. This is a good idea as you want to ensure all is
working before you connect back bricks into original positions. Let’s
turn it on to see how it looks so far.
20.) We will now move onto lighting the front of the building’s roof
section. Take the main section of the roof and turn it over. Take 1 LED
strip light (
striplight#2
) and stick it to the following section on the left