44
7.7.1
Operation and emergency brake (double brake)
The operation and emergency brake operate independently. They are arranged in a row on the motor pinion shaft.
The motor-sided brake is the operation brake Y1 and the cap-sided brake is the emergency brake Y2. Both brakes
are DC-disk brakes acting according to the closed circuit current principle.
Motor pinion shaft
Rotor
Motor cover
Operation
Emergency
brake Y1
brake Y2
Figure 43: Configuration of the operation and emergency brake
Operation brake Y1
The magnet coil of the operation brake Y1 gets its power supply by the rectifier. The direct current (DC) is operated
by the auxiliary contacts of the contactors K2 and K3.
Emergency brake Y2
The magnet coil of the emergency brake Y2 gets its power supply by the rectifier too.
The rectifier is supplied by alternating current (AC) out of the motor lines (U and V) 1L1 and 1L2.
Due to this AC
– supply the incidence time of the emergency brake is longer than of the operation brake.
Separate test of the operation and emergency brake (DGUV V17 (BGV C1) only)
The DC
– supply of both magnetic coils are equipped with a plug connector.
These connectors are marked with “1” for the operation brake Y1and “2” for the emergency brake Y2.
To check the brakes separately there is a special plug “P”. This plug is supplying DC power, when the
electric chain hoist is ready for operation.
•
Check the operation brake Y1:
Open connector “2“ and connect this connector with the plug marked with “P”.
The emergency brake will remain open and the proper function of the operation brake can be
checked with nominal load
. Reconnect connector “2” after this procedure.
•
Check the emergency brake Y2:
Carry out the same as above but connect “P“ with supply connector “1”.
The operation brake will remain open. Now the function of the emergency brake can be checked
separately. The test has to be carried out with nominal load. The brake distance of the emergency
brake is longer than the brake distance for the operation brake.
Caution!
Reconnect the plug connectors 1
– 1 and 2 -2 after each test.
Summary of Contents for STAGEKET
Page 55: ...55 13 Example of Declaration of Conformity...
Page 56: ...56 14 Example of Declaration of Incorporation...
Page 57: ...57...