Operating manual
Commissioning
TW160 drive
TK Aufzugswerke
65
Version 08/2021
7
Commissioning
7.1
Work steps
For assembly, use only original construction and mounting parts from
TK
Aufzugswerke
GmbH, as otherwise no warranty can be provided.
Before commissioning the machine, the following points must be checked and carried
out:
OK
Work step
1. Remove safety, auxiliary and installation tools from the danger
zone.
2. Check setup and alignment of machine, base frame, rope
departure and base.
3. Check the oil drain pipe is seated securely and leak-tight.
(Machine is filled with oil at the plant)
4. Check the gear oil level.
5. Check the secure mounting of the machine and base frame.
6. With a side or oblique rope departure, the gear housing is
secured against moving with end stops and set screws.
7. Make sure that the bolts are tightened with the prescribed
torque and secured.
8. Check the brake shoe stroke and setting
9. With SA3, SA3.1 and SA15 , check the setting and function of
the brake test switches.
9.2
10. Conduct a brake test with one brake shoe in each case.
8.7
11. Check the function and setting of the handbrake release
7.2
12. Fit the rope guard and set the distance to the traction sheave.
13. Check whether the power connections and earthing of the
motor, forced ventilation and brake magnet are connected and
secured.
14. Stick the direction arrow (Up / Down) clearly visible on the
motor near the handwinding wheel according to the direction
of travel.
Table 7.1-1
Summary of Contents for TW160
Page 1: ...OPERATING MANUAL TW160 Drive 08 2021 6234002860...
Page 6: ......
Page 24: ...Operating manual Technology TW160 drive TK Aufzugswerke 24 Version 08 2021...
Page 101: ......
Page 102: ......
Page 103: ......
Page 104: ...Tachogenerator RE 0444 zu SA 1 Anschlusshinweis...
Page 107: ......
Page 111: ...OPERATING MANUAL EMERGENCY BRAKE SYSTEMS NBS TW45 TW63 TW130 TW160...