Operating manual
Technology
TW160 drive
TK Aufzugswerke
48
Version 08/2021
Project planning dimensions
Project planning dimension L dependent on traction sheave diameter DT and
traction sheave position - left or right - of the machine
TW160_31005_ENG
955
1400
ASL
max
800
traction sheave version
rope distance elevator car - counterweight
DT
640
720
mm
795
ASL
min
875
Table 4.6-5
Position and number of insulation elements depending on the static shaft load
and rope pulley and traction sheave positions
I
II
III
IV
V
VI VII VIII
I
II
III
IV
V
VI VII VIII
90
1
1
-
2
1
2
1
1
1
1
1
1
1
2
1
1
75
1
1
-
1
1
1
1
1
1
1
1
1
1
1
1
1
60
1
1
-
1
-
1
1
1
1
1
-
1
1
1
1
1
30
1
1
-
-
-
-
1
1
1
1
-
-
-
-
1
1
I
II
III
IV
V
VI VII VIII
I
II
III
IV
V
VI VII VIII
90
1
1
1
1
2
1
1
1
1
1
2
-
2
1
1
1
75
1
1
1
1
1
1
1
1
1
1
1
-
2
1
1
1
60
1
1
1
-
1
1
1
1
1
1
1
-
1
-
1
1
30
1
1
-
-
-
-
1
1
1
1
-
-
-
-
1
1
TW160_31009_ENG
number of isolation elements
static
shaft load
F
t
[kN]
isolation element
1200
1400
isolation element
800
position for
rope distance elevator car - counterweight ASL [mm]
rope distance elevator car - counterweight ASL [mm]
number of isolation elements
1000
static
shaft load
F
t
[kN]
Table 4.6-6
Summary of Contents for TW160
Page 1: ...OPERATING MANUAL TW160 Drive 08 2021 6234002860...
Page 6: ......
Page 24: ...Operating manual Technology TW160 drive TK Aufzugswerke 24 Version 08 2021...
Page 101: ......
Page 102: ......
Page 103: ......
Page 104: ...Tachogenerator RE 0444 zu SA 1 Anschlusshinweis...
Page 107: ......
Page 111: ...OPERATING MANUAL EMERGENCY BRAKE SYSTEMS NBS TW45 TW63 TW130 TW160...